Frieze London 2026: Dates, Tickets, Tube Stations & Free Sculpture Trail

Frieze London and Frieze Masters return to The Regent’s Park from 14–18 October 2026, bringing almost 300 galleries from 48 countries and regions to London. The main fairs are ticketed, but visitors can also see Frieze Sculpture completely free in the park’s English Gardens. Wednesday 14 October is an invitation-only preview. General public access begins on Thursday afternoon, with the busiest public days expected from Friday through Sunday. Frieze Sculpture is already open and continues until 1 November, so no fair ticket is required to see the outdoor works.

For anyone travelling into London for the weekend, the nearest Tube station for Frieze London is Regent’s Park, while Baker Street and Great Portland Street are also close. Frieze Masters sits further north in the park, with Camden Town and Mornington Crescent among the nearest Underground options.



Frieze London 2026 dates and opening times

Date Frieze London Frieze Masters
Wednesday 14 October 11:00–19:00, invitation only 11:00–19:00, invitation only
Thursday 15 October General admission 13:00–17:00 General admission 13:00–19:00
Friday 16 October 11:00–19:00 11:00–19:00
Saturday 17 October 11:00–19:00 11:00–19:00
Sunday 18 October 11:00–18:00 11:00–18:00

Frieze's official visitor information says entry is date and time specific, with last admission 30 minutes before closing. General admission tickets do not permit re-entry.

How much are Frieze London tickets?

Tickets are available online only. Frieze's current visitor information says early-bird tickets have sold out, meaning anyone booking now should check the live ticket page for the remaining full-price options. For the public weekend on 17–18 October, the published full prices are:

Weekend ticket Full price
General admission to one fair £48
First Access before 15:00 £59
Combined Frieze London + Frieze Masters £92
Student combined admission £32
Child aged 2–17 £10

Booking fees can apply. Children under two do not require a ticket, while child tickets for ages 2–17 are limited to the weekend. Student tickets are combined tickets for both fairs and require valid student identification. Tickets and current availability are published on the official Frieze ticket page.

Is Frieze Sculpture free?

Yes. Frieze Sculpture is free and open to everyone. No Frieze London or Frieze Masters ticket is needed to walk through the outdoor exhibition in The Regent’s Park. The 2026 edition runs from 16 September until 1 November in the English Gardens at the south end of The Broadwalk. Frieze says the exhibition includes works by 11 international artists and is curated for the fourth year by Fatoş Üstek.

Artists in the 2026 exhibition include Angel Otero, Conrad Shawcross, Tarini Sethi and Ivana Bašić. The works are distributed through the English Gardens rather than contained inside the ticketed fair structures. Frieze's Sculpture guide provides details of the individual works and artists. A digital guide is also available through Bloomberg Connects. For visitors who want a Frieze experience without buying a fair ticket, the sculpture exhibition is therefore the simplest option. It can also be combined with other free London activities in LCM's Free Things to Do in London on 17–18 October guide.

Frieze London and Frieze Masters are different fairs

The two ticketed fairs sit within walking distance of one another but have different focuses.

Frieze London concentrates primarily on contemporary art and work created after 2000. Its 2026 programme includes the new curated section The Code Universe alongside Artist-to-Artist and the main gallery presentations.

Frieze Masters looks further back through art history, including ancient material, Old Masters and 20th-century art. Its 2026 programme includes Spotlight, Reflections and Queering Modernism.


Which Tube station is best for Frieze London?

Regent’s Park station on the Bakerloo line is the closest Underground station to Frieze London. Frieze says the Park Square West entrance is less than five minutes' walk from the station.

Baker Street is also close and gives access to the Bakerloo, Circle, Hammersmith & City, Jubilee and Metropolitan lines. Great Portland Street, served by the Circle, Hammersmith & City and Metropolitan lines, is another nearby option.

Frieze London is located at the southern end of The Regent’s Park, with its entrance off Park Square West. The published postcode is NW1 4LL.

Best Tube stations for Frieze Masters

Frieze Masters is on Gloucester Green at the north-east corner of The Regent’s Park, close to London Zoo. Its postcode is NW1 4HA. Frieze identifies Camden Town and Mornington Crescent, both on the Northern line, as around ten minutes' walk from Frieze Masters. Visitors attending both fairs do not necessarily need to walk between them. A complimentary shuttle bus is scheduled approximately every 15 minutes between the Frieze London and Frieze Masters entrances.

Weekend Tube and rail closures to watch

Visitors travelling on Saturday 17 or Sunday 18 October should also account for planned transport disruption elsewhere in London. The Piccadilly line will not run between Hammersmith and Heathrow or Uxbridge during the weekend, which is particularly relevant to international visitors arriving through Heathrow. London Victoria also loses all Southern and Gatwick Express services on Sunday 18 October. Visitors arriving through Gatwick should check LCM's Victoria and Gatwick Express closure guide. The full picture is covered in LCM's London Tube and Train Closures guide for 17–18 October.

Can you bring a bag into Frieze?

Large items measuring more than 40 x 20 x 40cm, including suitcases, folding bicycles and scooters, are not permitted inside the fairs. Backpacks can be brought in but must be carried by hand rather than worn. Frieze provides bag and coat facilities, but capacity is limited. Visitors travelling directly from an airport or hotel should therefore avoid arriving with large luggage.

Accessibility at Frieze London and Frieze Masters

Both fairs are accessible to visitors with reduced mobility. Entrance and exit ramps are provided, accessible toilets are available and a limited number of wheelchairs can be borrowed on a first-come, first-served basis. Frieze also provides free companion or carer tickets once the main visitor ticket has been booked. Hearing loops are installed at ticket, cloakroom and VIP enquiry desks.

Frequently Asked Questions

Is Frieze Sculpture free in 2026?
Yes. Frieze Sculpture in The Regent’s Park is free and does not require a Frieze London or Frieze Masters ticket. It runs until 1 November.

What is the nearest Tube station to Frieze London?
Regent’s Park station on the Bakerloo line is less than five minutes' walk from the Frieze London entrance. Baker Street and Great Portland Street are also nearby.

Can I buy Frieze tickets at the entrance?
Frieze states that tickets are available online only. Entry is tied to the date and time printed on the ticket.

Do I need separate tickets for Frieze London and Frieze Masters?
A ticket for one fair does not automatically cover the other. Combined tickets are available for visitors who want to attend both fairs on the same day.

Check ticket availability before travelling

Frieze says tickets are limited, early-bird allocations have sold out and remaining admission is online only. Visitors planning to attend the ticketed fairs should therefore secure their preferred date and entry time before travelling to The Regent’s Park.

Mihai Chelmus
Expert Verification & Authorship
Founder & Author, London Construction Magazine | Construction Testing & Investigation Specialist