Swantest: Leading Structural Testing, Site Investigations and Remedial Works in London and across UK

Swantest, a specialist company based in London renowned for providing comprehensive structural testing, investigation, remedial and strengthening solutions, continues to set the benchmark for excellence in the construction, demolition and civil engineering industries. With a team of multi-disciplined engineers, Swantest offers a wide range of specialist site services tailored to meet the needs of complex projects.

Swantest Site Specialist Services Include:

𝗦𝘁𝗿𝘂𝗰𝘁𝘂𝗿𝗮𝗹 𝗧𝗲𝘀𝘁𝗶𝗻𝗴
• Slab load capacity tests (𝗨𝗞𝗔𝗦 𝗮𝗰𝗰𝗿𝗲𝗱𝗶𝘁𝗲𝗱)
• Anchor and fixings tests (pull out and shear 𝗨𝗞𝗔𝗦 𝗮𝗻𝗱 𝗖𝗙𝗔 𝗮𝗰𝗰𝗿𝗲𝗱𝗶𝘁𝗲𝗱)
• Balcony and barrier load tests (𝗨𝗞𝗔𝗦 𝗮𝗰𝗰𝗿𝗲𝗱𝗶𝘁𝗲𝗱)
• Lift beam testing
• LOLER testing

𝗚𝗲𝗼𝘁𝗲𝗰𝗵𝗻𝗶𝗰𝗮𝗹 𝗧𝗲𝘀𝘁𝗶𝗻𝗴
• Plate Bearing tests & CBR% (𝗨𝗞𝗔𝗦 𝗮𝗰𝗰𝗿𝗲𝗱𝗶𝘁𝗲𝗱)
• Dynamic Cone Penetrometer (DCP) tests
• Lightweight Deflectometer tests (LWD)
• Soil Hand Shear Vane tests

𝗦𝘁𝗿𝘂𝗰𝘁𝘂𝗿𝗮𝗹 𝗜𝗻𝘃𝗲𝘀𝘁𝗶𝗴𝗮𝘁𝗶𝗼𝗻
• GPR and Ferro scanning
• Non-destructive testing
• Structural surveys and investigation
• Material sampling and testing

𝗦𝘁𝗿𝘂𝗰𝘁𝘂𝗿𝗮𝗹 𝗥𝗲𝗺𝗲𝗱𝗶𝗮𝘁𝗶𝗼𝗻
• CFRP Strengthening
• Concrete repair
• Temporary works install and inspections

𝗛𝘆𝗱𝗿𝗮𝘂𝗹𝗶𝗰 𝗔𝗽𝗽𝗹𝗶𝗰𝗮𝘁𝗶𝗼𝗻𝘀
• Temporary/permanent load transfer using hydraulic cylinders or flat jacks
• Preloading of bolts and crane grillages
• Bar/strand stressing

A Complete Package of Works

Swantest prides itself on providing clients with a complete package of works. From initial site investigation and surveys to structural testing, remedial and strengthening solutions, and design works if required, Swantest ensures that every aspect of a project is meticulously handled. The company also offers ongoing monitoring and inspections to guarantee the longevity and safety of their solutions.

Mihai Chelmus, Associate Director at Swantest, emphasises the company's commitment to excellence: "At Swantest, we understand the complexities of modern construction projects. Our goal is to provide our clients with reliable, innovative solutions that meet their specific needs. We are dedicated to delivering high-quality services that ensure the safety and integrity of structures."

He adds, "Our team of engineers is equipped with the latest technology and expertise to handle any challenge. We believe in a proactive approach, addressing potential issues before they become problems."

Looking Ahead

As Swantest continues to lead the industry with its innovative solutions and expert team, the company remains committed to upholding the highest standards of quality and safety. With a proven track record and a forward-thinking approach, Swantest is poised to make significant contributions to the construction industry in 2025 and beyond.

"We are excited about the future and the opportunities it holds," Mihai Chelmus concludes. "Our focus will always be on delivering exceptional service and ensuring the success of our clients' projects."

For more information, please contact Mihai Chelmus at mihai.chelmus@swantest.co.uk or call 07342281981.

أحدث أقدم