Swantest: Leading Concrete Ferro Scanning Services in London and across the UK

Swantest is a premier provider of structural testing, investigation, and strengthening solutions for complex projects in London and across the UK. With a team of multi-disciplined engineers, Swantest offers a comprehensive range of specialist site services to the construction, demolition and civil engineering industries. At the forefront of their offerings is their expertise in concrete ferro scanning, led by their renowned expert, Mihai Chelmus.

Contact Information

For more information or to discuss your project requirements, contact Mihai Chelmus at:
📲Phone: 07342 281981

Area scan 1200mm x 1200mm
Concrete ferro scanning is an essential service for detecting and positioning rebar within reinforced concrete structures. Swantest utilises the latest technology to provide detailed insights into sub-surface conditions, ensuring the safety and integrity of construction projects.

Swantest employs state-of-the-art equipment, including the Hilti and Proceq, which allows for precise detection of cover depth, bar diameter, bar spacing and mesh layout up to 600mm below the surface.

3D augmented reality visualization concrete wall reinforcement in real-time
Swantest offers two main types of ferro scanning surveys:

Quick Scans: Ideal for clients who need immediate results, quick scans mark the lateral position of rebar directly onto the concrete surface using chalk or paint. This method is perfect for those planning to drill or core through concrete, as it provides instant feedback and helps avoid reinforcement during drilling.

3D Image Scans: For more detailed information, image scans are conducted and analysed using specialist software. This method takes longer but provides comprehensive data on cover depth, bar diameter, bar spacing and overall mesh layout. The results are integrated into reports with 3D & CAD drawings as needed.

Ground Penetrating Radar (GPR) Scanning

In addition to ferro scanning, Swantest also offers GPR concrete scanning using the Hilti PS1000 and Proceq GPR Live systems. GPR scanning provides a detailed picture of sub-surface conditions, identifying voids, cracks, reinforcing bars, non-ferrous services and changes in surface conditions. This method offers several advantages, including the ability to calculate slab thickness, view multiple layers of reinforcement, and produce 3D and cross-sectional images of the concrete structure.

Non-Destructive Testing (NDT)

Swantest’s concrete scanning services are fully non-invasive, ensuring that the structure remains intact during testing. This approach is crucial for projects involving drilling, core sampling, or demolition, as it delivers reliable results without compromising the building’s integrity.

Key Benefits

✅ Safety Compliance: By identifying rebar, post-tension cables, and other elements, Swantest’s scanning services help meet safety standards on-site, preventing accidents and ensuring a smooth construction process.
✅ Void and Crack Detection: Locate potential weaknesses in concrete structures before they cause larger issues.
✅ Pipework and Utility Detection: Avoid damaging essential services hidden within the concrete.

Applications

✅ Pre-Demolition Inspections: Ensures that structural elements are identified, making the demolition process smoother and safer.
✅ Structural Integrity Assessments: Regular inspections help maintain the long-term safety of buildings.
✅ Refurbishment Projects: Allows safe navigation around critical structural components during modernization or modification.

About Mihai Chelmus BEng (Hons)

Mihai Chelmus, the Associate Director at Swantest, is a leading expert in concrete ferro scanning. With over 15 years of industry experience, Mihai has been instrumental in advancing Swantest’s capabilities and maintaining their reputation for excellence. His comprehensive approach to site solutions, combined with a commitment to adopting new technologies, ensures that Swantest remains at the cutting edge of the industry.
أحدث أقدم