Swantest: Pioneering Sustainable Structural Solutions in London and across UK

Swantest has been established to address the increasing industry demand for a sustainable, circular economy-led approach to the safe re-use and life extension of buildings and infrastructure.

Our specialist teams offer a comprehensive range of testing and analysis services to assess the integrity of materials in existing steel and concrete structures. By doing so, we help developers and constructors overcome the challenges posed by incomplete and imperfect structural data, often resulting from modifications and information loss over a building’s history.

Swantest's extensive site specialist technical services include:
✔ Structural surveys and investigations
✔ Structural testing and material sampling
✔ Structural strengthening and protection
✔ Design support for these activities
✔ Monitoring of structures

Our dedicated team of technical professionals is adept at creating bespoke solutions to complex problems, addressing the specific engineering challenges that have historically hindered the widespread adoption of building and infrastructure remodeling.

Swantest enables clients to extend the life or re-use existing buildings and structures that might otherwise face demolition. Our integrated services offer incremental development as investigations and designs progress, providing end-to-end transformations and bespoke technical solutions for structural crises.

In addition to supporting the re-use of structures, Swantest offers these specialist services to a wide range of construction, demolition, refurbishment and major civil projects.

For more information, please contact Mihai Chelmus, Associate Director at Swantest, at 07342281981 or mihai.chelmus@swantest.co.uk.

أحدث أقدم