Swantest Successfully Renews UKAS Accreditation

Swantest, the specialist structural testing, investigation and remedial division of Swanton Consulting Limited, has successfully renewed its UKAS accreditation following a comprehensive reassessment by the United Kingdom Accreditation Service (UKAS).

The reaccreditation confirms Swantest’s continued compliance with the highest industry standards for structural investigation, proof load testing and floor load testing, reaffirming its position as one of the very few UK companies accredited by UKAS for this type of work.

The official renewal letter from UKAS confirms that all improvement actions identified during the assessment have been successfully cleared, and Swantest’s accreditation has been fully renewed. The next reassessment cycle is scheduled for June 2026, continuing through to 2029.

Maintaining Confidence and Compliance in Testing

The UKAS mark of accreditation provides independent assurance that Swantest’s testing procedures, quality systems and reporting processes meet internationally recognised standards.

Maintaining UKAS accreditation reflects the consistency and professionalism behind every test we deliver, said Mihai Chelmus, Associate Director at Swantest. It’s a reassurance to our clients that our data stands up to scrutiny, every result is verified, reliable and compliant.

Liam Dixon, Associate Director, added: This accreditation reinforces the standards we hold ourselves to on every project. It’s not just about meeting requirements, it’s about setting a benchmark for quality in structural testing.

Swantest’s quality management system is overseen by Quality and Compliance Lead Anamaria Fercu (MEng PCQI), who coordinated the recent audit and evidence submission.

Specialist Accreditation in a Complex Field

Swantest’s scope of accreditation covers a wide range of on-site structural and geotechnical testing, including:

➜ Static floor load testing to BS EN standards
➜ Anchor pull-out and shear testing
➜ Barrier testing
➜ Plate bearing testing

Structural investigation and materials assessment

Few UK companies hold UKAS accreditation for in-situ floor load testing, which makes Swantest a trusted partner for clients requiring verifiable and compliant test data, particularly on complex refurbishment, repurposing and Building Safety Act projects.

Swantest operates across London and the UK, supporting structural engineers, contractors and developers in assessing the strength, performance and safety of existing structures.

By maintaining its UKAS accreditation, Swantest continues to support the wider construction industry’s need for data-driven assurance, helping deliver safe, efficient and compliant projects across the built environment.

About Swantest

Swantest is part of Swanton Consulting Limited, specialising in structural and materials testing, load verification and engineering investigation. Based in Erith, Kent, Swantest provides UKAS-accredited testing services for major projects across London and the UK.

🌐 Visit: swantest.co.uk
📧 Email: info@swantest.co.uk
📞 Call: +44 20 8148 2249

أحدث أقدم