UK Construction Hazard Register: Free Tool to Build a Hazard List

LCM Tools
Construction hazard register builder
Pick the work planned, tick the hazards that apply and print or download your list, with the law and guidance for each hazard.
253 hazards28 categories6 sections, A to FLaw and guidance mapped
1What work is planned? Optional. Pick one or more to narrow the register.
2Tick the hazards that apply

Search, filter or scroll the register below and tick each hazard that applies, or tick everything in the current view at once. Every project should at least cover Section A.

Showing all 253 hazards. Pick the work planned to narrow the register.
3Export your list
0hazards ticked
Your list

No hazards ticked yet. Ticks are saved in this browser, so your list is still here when you come back.

    A hazard identification aid, not a task-specific risk assessment or legal advice. Controls must be decided by a competent person for the work in hand.
    253 of 253 hazards shown

    ALegal, organisational & human factors

    A1CDM & Legal Compliance5

    RefHazardLaw / regulation / recognised guidance
    Failure to appoint competent CDM roles (Principal Designer / Principal Contractor)Construction (Design and Management) Regulations 2015 (regs 5 and 8: appointments and competence)Management of Health and Safety at Work Regulations 1999Health and Safety at Work etc. Act 1974
    Pre-construction information inadequateConstruction (Design and Management) Regulations 2015 (regs 4 and 11: client and principal designer duties)Management of Health and Safety at Work Regulations 1999Health and Safety at Work etc. Act 1974
    Construction Phase Plan missing or inadequateConstruction (Design and Management) Regulations 2015 (reg 12: construction phase plan)Management of Health and Safety at Work Regulations 1999Health and Safety at Work etc. Act 1974
    Health & Safety File not prepared or handed overConstruction (Design and Management) Regulations 2015 (reg 12: health and safety file)Management of Health and Safety at Work Regulations 1999Health and Safety at Work etc. Act 1974
    Notifiable project not notified to HSEConstruction (Design and Management) Regulations 2015 (reg 6: notification)Management of Health and Safety at Work Regulations 1999Health and Safety at Work etc. Act 1974

    A2Procedural / Organisational14

    RefHazardLaw / regulation / recognised guidance
    Lack of supervisionConstruction (Design and Management) Regulations 2015 (regs 13 and 15: planning, managing and monitoring work)Management of Health and Safety at Work Regulations 1999Health and Safety at Work etc. Act 1974
    Inadequate planningConstruction (Design and Management) Regulations 2015 (regs 13 and 15: planning, managing and monitoring work)Management of Health and Safety at Work Regulations 1999Health and Safety at Work etc. Act 1974
    Poor coordinationConstruction (Design and Management) Regulations 2015 (regs 11 and 13: coordination)Management of Health and Safety at Work Regulations 1999Health and Safety at Work etc. Act 1974
    Incorrect sequencingConstruction (Design and Management) Regulations 2015 (regs 13 and 15: planning, managing and monitoring work)Management of Health and Safety at Work Regulations 1999Health and Safety at Work etc. Act 1974
    Permit-to-work failuresConstruction (Design and Management) Regulations 2015 (regs 13 and 15: planning, managing and monitoring work)HSE HSG250 (permit-to-work systems, guidance)Management of Health and Safety at Work Regulations 1999Health and Safety at Work etc. Act 1974
    Inadequate briefings / toolbox talksConstruction (Design and Management) Regulations 2015 (reg 14: consulting and engaging with workers)Management of Health and Safety at Work Regulations 1999 (regs 10 and 13: information and training)Health and Safety at Work etc. Act 1974
    Incomplete inductionsConstruction (Design and Management) Regulations 2015 (reg 13: site induction)Management of Health and Safety at Work Regulations 1999Health and Safety at Work etc. Act 1974
    Inadequate monitoringConstruction (Design and Management) Regulations 2015 (regs 13 and 15: planning, managing and monitoring work)Management of Health and Safety at Work Regulations 1999 (reg 5: monitoring and review arrangements)Health and Safety at Work etc. Act 1974
    Documentation errorsConstruction (Design and Management) Regulations 2015Management of Health and Safety at Work Regulations 1999Health and Safety at Work etc. Act 1974
    Working outside RAMSConstruction (Design and Management) Regulations 2015 (reg 15: contractors' duties)Management of Health and Safety at Work Regulations 1999 (reg 3: risk assessment)Health and Safety at Work etc. Act 1974
    Poor change control / management of changeConstruction (Design and Management) Regulations 2015 (regs 11 and 13: coordination)Management of Health and Safety at Work Regulations 1999 (reg 3: reviewing the risk assessment)Health and Safety at Work etc. Act 1974
    SIMOPS conflicts (simultaneous operations)Construction (Design and Management) Regulations 2015 (reg 13: coordination)Management of Health and Safety at Work Regulations 1999 (reg 11: co-operation and co-ordination on shared workplaces)Health and Safety at Work etc. Act 1974
    Inadequate competence verificationConstruction (Design and Management) Regulations 2015 (reg 8: competence)Management of Health and Safety at Work Regulations 1999Health and Safety at Work etc. Act 1974
    Lack of lessons learned from incidentsManagement of Health and Safety at Work Regulations 1999 (reg 5: monitoring and review arrangements)Reporting of Injuries, Diseases and Dangerous Occurrences Regulations 2013 (RIDDOR)Construction (Design and Management) Regulations 2015Health and Safety at Work etc. Act 1974

    A3Human Factors14

    RefHazardLaw / regulation / recognised guidance
    FatigueWorking Time Regulations 1998Construction (Design and Management) Regulations 2015Management of Health and Safety at Work Regulations 1999Health and Safety at Work etc. Act 1974
    Stress / mental healthManagement of Health and Safety at Work Regulations 1999 (reg 3: risk assessment)HSE Management Standards for work-related stress (guidance)Construction (Design and Management) Regulations 2015Health and Safety at Work etc. Act 1974
    Competence gapsConstruction (Design and Management) Regulations 2015 (reg 8: competence)Management of Health and Safety at Work Regulations 1999 (reg 13: capabilities and training)Health and Safety at Work etc. Act 1974
    ComplacencyConstruction (Design and Management) Regulations 2015Management of Health and Safety at Work Regulations 1999Health and Safety at Work etc. Act 1974
    Poor communicationManagement of Health and Safety at Work Regulations 1999 (reg 10: information for employees)Construction (Design and Management) Regulations 2015Health and Safety at Work etc. Act 1974
    MisinterpretationConstruction (Design and Management) Regulations 2015Management of Health and Safety at Work Regulations 1999Health and Safety at Work etc. Act 1974
    OverconfidenceConstruction (Design and Management) Regulations 2015Management of Health and Safety at Work Regulations 1999Health and Safety at Work etc. Act 1974
    Decision-making pressureConstruction (Design and Management) Regulations 2015Management of Health and Safety at Work Regulations 1999Health and Safety at Work etc. Act 1974
    Ergonomic strain / awkward posturesManual Handling Operations Regulations 1992Construction (Design and Management) Regulations 2015Management of Health and Safety at Work Regulations 1999Health and Safety at Work etc. Act 1974
    Lone workingManagement of Health and Safety at Work Regulations 1999 (reg 3: risk assessment)HSE INDG73 (lone working, guidance)Construction (Design and Management) Regulations 2015Health and Safety at Work etc. Act 1974
    Substance impairmentConstruction (Design and Management) Regulations 2015Management of Health and Safety at Work Regulations 1999Health and Safety at Work etc. Act 1974
    Language / literacy barriersManagement of Health and Safety at Work Regulations 1999 (reg 10: comprehensible information for employees)Construction (Design and Management) Regulations 2015Health and Safety at Work etc. Act 1974
    Shift work / night work disruptionWorking Time Regulations 1998 (night work limits and health assessments)Construction (Design and Management) Regulations 2015Management of Health and Safety at Work Regulations 1999Health and Safety at Work etc. Act 1974
    Bullying / harassmentProtection from Harassment Act 1997Equality Act 2010 (harassment related to a protected characteristic)Construction (Design and Management) Regulations 2015Management of Health and Safety at Work Regulations 1999Health and Safety at Work etc. Act 1974

    A4Information / Design / Communication10

    RefHazardLaw / regulation / recognised guidance
    Incorrect drawings or surveysConstruction (Design and Management) Regulations 2015 (reg 9: designers' duties)Management of Health and Safety at Work Regulations 1999Health and Safety at Work etc. Act 1974
    Misinterpreted design dataConstruction (Design and Management) Regulations 2015 (reg 9: designers' duties)Management of Health and Safety at Work Regulations 1999Health and Safety at Work etc. Act 1974
    Incorrect test data useConstruction (Design and Management) Regulations 2015 (reg 9: designers' duties)Management of Health and Safety at Work Regulations 1999Health and Safety at Work etc. Act 1974
    Missing residual risks (CDM)Construction (Design and Management) Regulations 2015 (reg 9: designers' duties, including residual risk information)Management of Health and Safety at Work Regulations 1999Health and Safety at Work etc. Act 1974
    Poor design assumptionsConstruction (Design and Management) Regulations 2015 (reg 9: designers' duties)Management of Health and Safety at Work Regulations 1999Health and Safety at Work etc. Act 1974
    Undocumented limitationsConstruction (Design and Management) Regulations 2015 (reg 9: designers' duties)Management of Health and Safety at Work Regulations 1999Health and Safety at Work etc. Act 1974
    H&S file not updated / incompleteConstruction (Design and Management) Regulations 2015 (reg 12: health and safety file)Management of Health and Safety at Work Regulations 1999Health and Safety at Work etc. Act 1974
    Poor design–construction interfaceConstruction (Design and Management) Regulations 2015 (regs 11 and 13: coordination)Management of Health and Safety at Work Regulations 1999Health and Safety at Work etc. Act 1974
    As-built vs actual conditions mismatchConstruction (Design and Management) Regulations 2015 (regs 4 and 12: pre-construction information and health and safety file)Management of Health and Safety at Work Regulations 1999Health and Safety at Work etc. Act 1974
    Inadequate site investigation dataConstruction (Design and Management) Regulations 2015 (reg 4: client duty to provide pre-construction information)Management of Health and Safety at Work Regulations 1999Health and Safety at Work etc. Act 1974

    BPre-construction information & site conditions

    B1Environmental Hazards18

    RefHazardLaw / regulation / recognised guidance
    Mud / softened groundConstruction (Design and Management) Regulations 2015 (reg 17: safe places of construction work)Management of Health and Safety at Work Regulations 1999Health and Safety at Work etc. Act 1974
    Poor ventilationConstruction (Design and Management) Regulations 2015 (reg 33: fresh air)Management of Health and Safety at Work Regulations 1999Health and Safety at Work etc. Act 1974
    Confined spaces (environmental aspect)Confined Spaces Regulations 1997Construction (Design and Management) Regulations 2015Health and Safety at Work etc. Act 1974
    Cold exposure / hypothermiaConstruction (Design and Management) Regulations 2015 (reg 34 and Schedule 2: weather protection and welfare)Management of Health and Safety at Work Regulations 1999Health and Safety at Work etc. Act 1974
    Heat exposure / heat strokeConstruction (Design and Management) Regulations 2015 (reg 34 and Schedule 2: temperature, weather protection and welfare)Management of Health and Safety at Work Regulations 1999Health and Safety at Work etc. Act 1974
    HumidityConstruction (Design and Management) Regulations 2015 (regs 33 and 34: fresh air and temperature)Management of Health and Safety at Work Regulations 1999Health and Safety at Work etc. Act 1974
    Wind loadingWork at Height Regulations 2005 (where work at height is affected)Construction (Design and Management) Regulations 2015Health and Safety at Work etc. Act 1974
    Solar glareConstruction (Design and Management) Regulations 2015 (regs 17 and 35: safe places of work and lighting)Management of Health and Safety at Work Regulations 1999Health and Safety at Work etc. Act 1974
    PollutionEnvironmental Protection Act 1990 (where applicable)Construction (Design and Management) Regulations 2015Health and Safety at Work etc. Act 1974
    Contaminated landControl of Substances Hazardous to Health Regulations 2002 (COSHH)Environmental Protection Act 1990 (where applicable)Construction (Design and Management) Regulations 2015Health and Safety at Work etc. Act 1974
    Darkness / night workingConstruction (Design and Management) Regulations 2015 (reg 35: lighting)Management of Health and Safety at Work Regulations 1999Health and Safety at Work etc. Act 1974
    Lightning strikeConstruction (Design and Management) Regulations 2015Management of Health and Safety at Work Regulations 1999Health and Safety at Work etc. Act 1974
    Flooding / flash floodingConstruction (Design and Management) Regulations 2015 (reg 29: prevention of risk from flooding)Management of Health and Safety at Work Regulations 1999Health and Safety at Work etc. Act 1974
    Ground instability / subsidenceConstruction (Design and Management) Regulations 2015 (regs 19 and 22: stability of structures and excavations)Management of Health and Safety at Work Regulations 1999Health and Safety at Work etc. Act 1974
    Ground gases (methane/CO₂/H₂S)Control of Substances Hazardous to Health Regulations 2002 (COSHH)Dangerous Substances and Explosive Atmospheres Regulations 2002 (DSEAR) (where flammable gases are present)Confined Spaces Regulations 1997 (where applicable)Health and Safety at Work etc. Act 1974
    Radon (ionising radiation)Ionising Radiations Regulations 2017Health and Safety at Work etc. Act 1974
    UXO presenceConstruction (Design and Management) Regulations 2015 (reg 4: pre-construction information)CIRIA C681 (unexploded ordnance, guidance)Management of Health and Safety at Work Regulations 1999Health and Safety at Work etc. Act 1974
    Coastal erosion / tidal surgeConstruction (Design and Management) Regulations 2015Management of Health and Safety at Work Regulations 1999Health and Safety at Work etc. Act 1974

    B2Ground Works & Geotechnical8

    RefHazardLaw / regulation / recognised guidance
    Excavation collapse (general)Construction (Design and Management) Regulations 2015 (reg 22: excavations)Management of Health and Safety at Work Regulations 1999Health and Safety at Work etc. Act 1974
    Base heaveConstruction (Design and Management) Regulations 2015 (reg 22: excavations)Management of Health and Safety at Work Regulations 1999Health and Safety at Work etc. Act 1974
    Running sands / pipingConstruction (Design and Management) Regulations 2015 (reg 22: excavations)Management of Health and Safety at Work Regulations 1999Health and Safety at Work etc. Act 1974
    Hydraulic inflowConstruction (Design and Management) Regulations 2015 (reg 22: excavations)Management of Health and Safety at Work Regulations 1999Health and Safety at Work etc. Act 1974
    Edge surchargeConstruction (Design and Management) Regulations 2015 (reg 22: excavations)Management of Health and Safety at Work Regulations 1999Health and Safety at Work etc. Act 1974
    Buried obstructions (foundations/tanks)Construction (Design and Management) Regulations 2015 (reg 22: excavations)Management of Health and Safety at Work Regulations 1999Health and Safety at Work etc. Act 1974
    Artesian conditionsConstruction (Design and Management) Regulations 2015 (reg 22: excavations)Management of Health and Safety at Work Regulations 1999Health and Safety at Work etc. Act 1974
    Made ground instabilityConstruction (Design and Management) Regulations 2015 (reg 22: excavations)Management of Health and Safety at Work Regulations 1999Health and Safety at Work etc. Act 1974

    B3Utilities & Services6

    RefHazardLaw / regulation / recognised guidance
    Underground electrical cable strike (HSG47)Construction (Design and Management) Regulations 2015 (reg 25: energy distribution installations)Electricity at Work Regulations 1989HSE HSG47 (avoiding danger from underground services)Health and Safety at Work etc. Act 1974
    Gas pipe strikeConstruction (Design and Management) Regulations 2015 (reg 25: energy distribution installations)HSE HSG47 (avoiding danger from underground services)Pipelines Safety Regulations 1996 (where applicable)Health and Safety at Work etc. Act 1974
    Water main strikeHSE HSG47 (avoiding danger from underground services)Construction (Design and Management) Regulations 2015Health and Safety at Work etc. Act 1974
    Telecoms / fibre strikeHSE HSG47 (avoiding danger from underground services)Construction (Design and Management) Regulations 2015Health and Safety at Work etc. Act 1974
    Service diversion failureHSE HSG47 (avoiding danger from underground services)Construction (Design and Management) Regulations 2015Health and Safety at Work etc. Act 1974
    Live services not isolatedConstruction (Design and Management) Regulations 2015 (reg 25: energy distribution installations)HSE HSG47 (avoiding danger from underground services)Electricity at Work Regulations 1989 (for electrical services)Health and Safety at Work etc. Act 1974

    B4Radiation & Non-Ionising1

    RefHazardLaw / regulation / recognised guidance
    Laser hazardsControl of Artificial Optical Radiation at Work Regulations 2010Health and Safety at Work etc. Act 1974

    B5Biological Hazards11

    RefHazardLaw / regulation / recognised guidance
    Leptospirosis (Weil's disease)Control of Substances Hazardous to Health Regulations 2002 (COSHH)Health and Safety at Work etc. Act 1974
    Bacteria (Legionella, tetanus)Control of Substances Hazardous to Health Regulations 2002 (COSHH)Health and Safety at Work etc. Act 1974
    Mould / fungal sporesControl of Substances Hazardous to Health Regulations 2002 (COSHH)Health and Safety at Work etc. Act 1974
    Sewage contaminationControl of Substances Hazardous to Health Regulations 2002 (COSHH)Health and Safety at Work etc. Act 1974
    Bird droppingsControl of Substances Hazardous to Health Regulations 2002 (COSHH)Health and Safety at Work etc. Act 1974
    Insect / rodent infestationControl of Substances Hazardous to Health Regulations 2002 (COSHH)Health and Safety at Work etc. Act 1974
    Biological agents in soilControl of Substances Hazardous to Health Regulations 2002 (COSHH)Health and Safety at Work etc. Act 1974
    Contaminated surfacesControl of Substances Hazardous to Health Regulations 2002 (COSHH)Health and Safety at Work etc. Act 1974
    Zoonotic diseases (Lyme)Control of Substances Hazardous to Health Regulations 2002 (COSHH)Health and Safety at Work etc. Act 1974
    Japanese knotweedWildlife and Countryside Act 1981 (where applicable)Environmental Protection Act 1990 (where applicable) (controlled waste, where applicable)Health and Safety at Work etc. Act 1974
    Giant hogweedWildlife and Countryside Act 1981 (where applicable)Management of Health and Safety at Work Regulations 1999Health and Safety at Work etc. Act 1974

    CHigh-risk construction activities

    C1Confined Space8

    RefHazardLaw / regulation / recognised guidance
    Oxygen deficiencyConfined Spaces Regulations 1997Construction (Design and Management) Regulations 2015 (regs 29 and 30: fire, flooding, asphyxiation and emergency procedures)Health and Safety at Work etc. Act 1974
    Oxygen enrichment (fire risk)Confined Spaces Regulations 1997Construction (Design and Management) Regulations 2015 (regs 29 and 30: fire, flooding, asphyxiation and emergency procedures)Health and Safety at Work etc. Act 1974
    Toxic atmosphereConfined Spaces Regulations 1997Construction (Design and Management) Regulations 2015 (regs 29 and 30: fire, flooding, asphyxiation and emergency procedures)Health and Safety at Work etc. Act 1974
    Heat build-upConfined Spaces Regulations 1997Construction (Design and Management) Regulations 2015 (regs 29 and 30: fire, flooding, asphyxiation and emergency procedures)Health and Safety at Work etc. Act 1974
    Limited escape routesConfined Spaces Regulations 1997Construction (Design and Management) Regulations 2015 (regs 29 and 30: fire, flooding, asphyxiation and emergency procedures)Health and Safety at Work etc. Act 1974
    Water ingress / floodingConfined Spaces Regulations 1997Construction (Design and Management) Regulations 2015 (regs 29 and 30: fire, flooding, asphyxiation and emergency procedures)Health and Safety at Work etc. Act 1974
    Inert gas asphyxiation (N₂/Ar/CO₂)Confined Spaces Regulations 1997Construction (Design and Management) Regulations 2015 (regs 29 and 30: fire, flooding, asphyxiation and emergency procedures)Health and Safety at Work etc. Act 1974
    Sludge/liquid drowningConfined Spaces Regulations 1997Construction (Design and Management) Regulations 2015 (regs 29 and 30: fire, flooding, asphyxiation and emergency procedures)Health and Safety at Work etc. Act 1974

    C2Working at Height12

    RefHazardLaw / regulation / recognised guidance
    Inadequate edge protectionWork at Height Regulations 2005 (Schedule 2: guard-rails and collective safeguards)Health and Safety at Work etc. Act 1974
    Guardrail failureWork at Height Regulations 2005 (Schedule 2: guard-rails and collective safeguards)Health and Safety at Work etc. Act 1974
    Ladder failure / misuseWork at Height Regulations 2005 (Schedule 6: ladders)Health and Safety at Work etc. Act 1974
    Mobile tower instabilityWork at Height Regulations 2005 (Schedule 3: working platforms)Health and Safety at Work etc. Act 1974
    MEWP overturningWork at Height Regulations 2005Provision and Use of Work Equipment Regulations 1998 (PUWER)Lifting Operations and Lifting Equipment Regulations 1998 (LOLER)Health and Safety at Work etc. Act 1974
    Harness / lanyard failureWork at Height Regulations 2005 (Schedule 5: personal fall protection systems)Health and Safety at Work etc. Act 1974
    Anchor point failureWork at Height Regulations 2005 (Schedule 5: personal fall protection systems)Health and Safety at Work etc. Act 1974
    Roof fragility not identifiedWork at Height Regulations 2005 (reg 9: fragile surfaces)Health and Safety at Work etc. Act 1974
    Skylight fallsWork at Height Regulations 2005 (reg 9: fragile surfaces)Health and Safety at Work etc. Act 1974
    Incomplete / damaged scaffoldingWork at Height Regulations 2005 (reg 12 and Schedule 3: inspection and scaffolding)Construction (Design and Management) Regulations 2015Health and Safety at Work etc. Act 1974
    Leading edge workWork at Height Regulations 2005Health and Safety at Work etc. Act 1974
    Working on sloping roofsWork at Height Regulations 2005Health and Safety at Work etc. Act 1974

    C3Fire & Explosion8

    RefHazardLaw / regulation / recognised guidance
    Hot works (welding/cutting/grinding)Construction (Design and Management) Regulations 2015 (regs 29, 30 and 32: fire risk, emergency procedures and fire-fighting)Dangerous Substances and Explosive Atmospheres Regulations 2002 (DSEAR) (where flammable substances or atmospheres are present)Health and Safety at Work etc. Act 1974
    Electrical faultsElectricity at Work Regulations 1989Construction (Design and Management) Regulations 2015 (regs 29, 30 and 32: fire risk, emergency procedures and fire-fighting)Health and Safety at Work etc. Act 1974
    Battery fires (Li-ion)Construction (Design and Management) Regulations 2015 (regs 29, 30 and 32: fire risk, emergency procedures and fire-fighting)Dangerous Substances and Explosive Atmospheres Regulations 2002 (DSEAR) (where an explosive atmosphere risk exists)Health and Safety at Work etc. Act 1974
    Flammable dust explosionsDangerous Substances and Explosive Atmospheres Regulations 2002 (DSEAR)Construction (Design and Management) Regulations 2015 (regs 29, 30 and 32: fire risk, emergency procedures and fire-fighting)Health and Safety at Work etc. Act 1974
    Pressurised system explosionPressure Systems Safety Regulations 2000Construction (Design and Management) Regulations 2015 (reg 29: prevention of risk from fire and explosion)Health and Safety at Work etc. Act 1974
    Gas leak / explosionDangerous Substances and Explosive Atmospheres Regulations 2002 (DSEAR)Construction (Design and Management) Regulations 2015 (reg 29: prevention of risk from fire and explosion)Health and Safety at Work etc. Act 1974
    DSEAR zoning/ignition source controlDangerous Substances and Explosive Atmospheres Regulations 2002 (DSEAR)Health and Safety at Work etc. Act 1974
    Spontaneous combustionConstruction (Design and Management) Regulations 2015 (regs 29, 30 and 32: fire risk, emergency procedures and fire-fighting)Dangerous Substances and Explosive Atmospheres Regulations 2002 (DSEAR) (where dangerous substances are involved)Health and Safety at Work etc. Act 1974

    C4Electrical7

    RefHazardLaw / regulation / recognised guidance
    Electrical shockElectricity at Work Regulations 1989Health and Safety at Work etc. Act 1974
    Arcing / explosionElectricity at Work Regulations 1989Health and Safety at Work etc. Act 1974
    Arc flashElectricity at Work Regulations 1989 (reg 14: work on or near live conductors)Health and Safety at Work etc. Act 1974
    Faulty equipmentElectricity at Work Regulations 1989Health and Safety at Work etc. Act 1974
    Improper isolation (lock-off failure)Electricity at Work Regulations 1989 (regs 12 and 13: isolation and work on dead equipment)Health and Safety at Work etc. Act 1974
    Overhead cable strikesElectricity at Work Regulations 1989Construction (Design and Management) Regulations 2015 (reg 25: energy distribution installations)HSE GS6 (avoiding danger from overhead power lines)Health and Safety at Work etc. Act 1974
    RCD failureElectricity at Work Regulations 1989Health and Safety at Work etc. Act 1974

    C5Chemical & Hazardous Substances15

    RefHazardLaw / regulation / recognised guidance
    Fumes (welding/diesel)Control of Substances Hazardous to Health Regulations 2002 (COSHH)Health and Safety at Work etc. Act 1974
    Vapours (solvents/VOCs)Control of Substances Hazardous to Health Regulations 2002 (COSHH)Dangerous Substances and Explosive Atmospheres Regulations 2002 (DSEAR) (where vapours are flammable)Health and Safety at Work etc. Act 1974
    Hazardous liquids (acids/alkalis)Control of Substances Hazardous to Health Regulations 2002 (COSHH)Health and Safety at Work etc. Act 1974
    Cementitious materials (wet concrete/mortar)Control of Substances Hazardous to Health Regulations 2002 (COSHH)Health and Safety at Work etc. Act 1974
    Contaminated water/soilControl of Substances Hazardous to Health Regulations 2002 (COSHH)Health and Safety at Work etc. Act 1974
    Silica dust (RCS)Control of Substances Hazardous to Health Regulations 2002 (COSHH)HSE EH40/2005 Workplace exposure limits (guidance)Health and Safety at Work etc. Act 1974
    Asbestos exposure (building fabric)Control of Asbestos Regulations 2012 (reg 5: identifying asbestos before work)Health and Safety at Work etc. Act 1974
    Asbestos in soils/recycled fillControl of Asbestos Regulations 2012Health and Safety at Work etc. Act 1974
    Welding fumesControl of Substances Hazardous to Health Regulations 2002 (COSHH)Health and Safety at Work etc. Act 1974
    Diesel exhaustControl of Substances Hazardous to Health Regulations 2002 (COSHH)Health and Safety at Work etc. Act 1974
    DSEAR explosive atmospheresDangerous Substances and Explosive Atmospheres Regulations 2002 (DSEAR)Health and Safety at Work etc. Act 1974
    Lead exposure (paint/pipework)Control of Lead at Work Regulations 2002Health and Safety at Work etc. Act 1974
    Ground vapours (VOCs)Control of Substances Hazardous to Health Regulations 2002 (COSHH)Dangerous Substances and Explosive Atmospheres Regulations 2002 (DSEAR) (where vapours are flammable)Health and Safety at Work etc. Act 1974
    IsocyanatesControl of Substances Hazardous to Health Regulations 2002 (COSHH)Health and Safety at Work etc. Act 1974
    Epoxy resins (sensitisation)Control of Substances Hazardous to Health Regulations 2002 (COSHH)Health and Safety at Work etc. Act 1974

    C6Physical Hazards10

    RefHazardLaw / regulation / recognised guidance
    Slips, trips, falls (same level)Construction (Design and Management) Regulations 2015 (reg 17: safe places of construction work)Health and Safety at Work etc. Act 1974
    Falling objectsWork at Height Regulations 2005 (reg 10: falling objects)Construction (Design and Management) Regulations 2015Health and Safety at Work etc. Act 1974
    Impact / struck-byProvision and Use of Work Equipment Regulations 1998 (PUWER) (where work equipment is involved)Construction (Design and Management) Regulations 2015Health and Safety at Work etc. Act 1974
    Crushing / entrapmentProvision and Use of Work Equipment Regulations 1998 (PUWER) (where machinery or work equipment is involved)Construction (Design and Management) Regulations 2015Health and Safety at Work etc. Act 1974
    Sharp edges / cuts / lacerationsProvision and Use of Work Equipment Regulations 1998 (PUWER) (where tools or machinery are involved)Construction (Design and Management) Regulations 2015Health and Safety at Work etc. Act 1974
    Housekeeping hazardsConstruction (Design and Management) Regulations 2015 (regs 17 and 18: safe places of work and good order)Health and Safety at Work etc. Act 1974
    Manual handling injuriesManual Handling Operations Regulations 1992Health and Safety at Work etc. Act 1974
    Repetitive strain injuriesManual Handling Operations Regulations 1992 (where manual handling is involved)Management of Health and Safety at Work Regulations 1999Health and Safety at Work etc. Act 1974
    Needle-stick injuriesControl of Substances Hazardous to Health Regulations 2002 (COSHH)Management of Health and Safety at Work Regulations 1999Health and Safety at Work etc. Act 1974
    Unguarded openings/voids/penetrationsWork at Height Regulations 2005Construction (Design and Management) Regulations 2015Health and Safety at Work etc. Act 1974

    C7Structural Hazards10

    RefHazardLaw / regulation / recognised guidance
    Structural collapse (total)Construction (Design and Management) Regulations 2015 (reg 19: stability of structures)Health and Safety at Work etc. Act 1974
    Loss of stabilityConstruction (Design and Management) Regulations 2015 (reg 19: stability of structures)Health and Safety at Work etc. Act 1974
    Overloading (dead/live loads)BS 5975 (temporary works, recognised practice) (where temporary works are involved)Construction (Design and Management) Regulations 2015Health and Safety at Work etc. Act 1974
    Deterioration/corrosionConstruction (Design and Management) Regulations 2015 (reg 19: stability of structures)Management of Health and Safety at Work Regulations 1999Health and Safety at Work etc. Act 1974
    Hidden defectsConstruction (Design and Management) Regulations 2015 (reg 19: stability of structures)Health and Safety at Work etc. Act 1974
    Unsupported edgesWork at Height Regulations 2005Construction (Design and Management) Regulations 2015Health and Safety at Work etc. Act 1974
    Temporary works failure (propping/shoring/falsework)BS 5975 (temporary works, recognised practice)Construction (Design and Management) Regulations 2015Health and Safety at Work etc. Act 1974
    Scaffold collapseWork at Height Regulations 2005Construction (Design and Management) Regulations 2015Health and Safety at Work etc. Act 1974
    Adjacent structure damageConstruction (Design and Management) Regulations 2015 (reg 19: stability of structures)Health and Safety at Work etc. Act 1974
    Falsework/centering collapseBS 5975 (temporary works, recognised practice)Construction (Design and Management) Regulations 2015Health and Safety at Work etc. Act 1974

    C8Mechanical & Machinery16

    RefHazardLaw / regulation / recognised guidance
    Moving plant/machineryProvision and Use of Work Equipment Regulations 1998 (PUWER)Construction (Design and Management) Regulations 2015 (regs 27 and 28: traffic routes and vehicles)Health and Safety at Work etc. Act 1974
    Machine overturningProvision and Use of Work Equipment Regulations 1998 (PUWER)Health and Safety at Work etc. Act 1974
    Mechanical failureProvision and Use of Work Equipment Regulations 1998 (PUWER)Health and Safety at Work etc. Act 1974
    Guarding failuresProvision and Use of Work Equipment Regulations 1998 (PUWER)Health and Safety at Work etc. Act 1974
    EntanglementProvision and Use of Work Equipment Regulations 1998 (PUWER)Health and Safety at Work etc. Act 1974
    Pinch/crush pointsProvision and Use of Work Equipment Regulations 1998 (PUWER)Health and Safety at Work etc. Act 1974
    Stored mechanical energyProvision and Use of Work Equipment Regulations 1998 (PUWER)Health and Safety at Work etc. Act 1974
    Hydraulic failure / hose whipProvision and Use of Work Equipment Regulations 1998 (PUWER)Health and Safety at Work etc. Act 1974
    Pneumatic failureProvision and Use of Work Equipment Regulations 1998 (PUWER)Pressure Systems Safety Regulations 2000 (where the pneumatic system is within scope)Health and Safety at Work etc. Act 1974
    Tool failure (breakage/ejection)Provision and Use of Work Equipment Regulations 1998 (PUWER)Health and Safety at Work etc. Act 1974
    Ejection of materialsProvision and Use of Work Equipment Regulations 1998 (PUWER)Health and Safety at Work etc. Act 1974
    Lifting equipment failure (cranes/hoists/MEWPs)Provision and Use of Work Equipment Regulations 1998 (PUWER)Lifting Operations and Lifting Equipment Regulations 1998 (LOLER) (reg 9: thorough examination and inspection)Health and Safety at Work etc. Act 1974
    Load drop from heightLifting Operations and Lifting Equipment Regulations 1998 (LOLER) (reg 8: organisation of lifting operations)Health and Safety at Work etc. Act 1974
    Slinging/rigging failuresLifting Operations and Lifting Equipment Regulations 1998 (LOLER) (reg 8: organisation of lifting operations)Health and Safety at Work etc. Act 1974
    Wire rope/chain failureLifting Operations and Lifting Equipment Regulations 1998 (LOLER) (reg 9: thorough examination and inspection)Health and Safety at Work etc. Act 1974
    Abrasive wheel burstProvision and Use of Work Equipment Regulations 1998 (PUWER)Health and Safety at Work etc. Act 1974

    DSpecialist & discipline-specific works

    D1Demolition-Specific7

    RefHazardLaw / regulation / recognised guidance
    Uncontrolled collapseConstruction (Design and Management) Regulations 2015 (reg 20: demolition or dismantling)BS 6187 (demolition, recognised practice)Health and Safety at Work etc. Act 1974
    Premature collapseConstruction (Design and Management) Regulations 2015 (reg 20: demolition or dismantling)BS 6187 (demolition, recognised practice)Health and Safety at Work etc. Act 1974
    Debris ejectionConstruction (Design and Management) Regulations 2015 (reg 20: demolition or dismantling)BS 6187 (demolition, recognised practice)Health and Safety at Work etc. Act 1974
    Pre-weakening errorsConstruction (Design and Management) Regulations 2015 (reg 20: demolition or dismantling)BS 6187 (demolition, recognised practice)Health and Safety at Work etc. Act 1974
    Accidental damage to retained structuresConstruction (Design and Management) Regulations 2015 (reg 20: demolition or dismantling)BS 6187 (demolition, recognised practice)Health and Safety at Work etc. Act 1974
    Blast/vibration from demolitionConstruction (Design and Management) Regulations 2015 (reg 20: demolition or dismantling)BS 6187 (demolition, recognised practice)Health and Safety at Work etc. Act 1974
    Buried services activationConstruction (Design and Management) Regulations 2015 (regs 20 and 25: demolition and energy distribution installations)HSE HSG47 (avoiding danger from underground services)Electricity at Work Regulations 1989 (for electrical services)Health and Safety at Work etc. Act 1974

    D2Tunnelling & Underground Works8

    RefHazardLaw / regulation / recognised guidance
    Tunnel collapseConstruction (Design and Management) Regulations 2015 (regs 19 and 22: stability of structures and excavations)Health and Safety at Work etc. Act 1974
    Ground settlement/subsidence aboveConstruction (Design and Management) Regulations 2015 (reg 22: excavations)Health and Safety at Work etc. Act 1974
    Compressed air working (hyperbaric)Work in Compressed Air Regulations 1996Construction (Design and Management) Regulations 2015Health and Safety at Work etc. Act 1974
    Methane/H₂S ingressConstruction (Design and Management) Regulations 2015 (regs 29 and 30: asphyxiation and emergency procedures)Control of Substances Hazardous to Health Regulations 2002 (COSHH)Dangerous Substances and Explosive Atmospheres Regulations 2002 (DSEAR) (where flammable gas is present)Confined Spaces Regulations 1997 (where applicable)Health and Safety at Work etc. Act 1974
    Groundwater inrushConstruction (Design and Management) Regulations 2015 (reg 29: prevention of risk from flooding)Confined Spaces Regulations 1997 (where applicable)Health and Safety at Work etc. Act 1974
    Shaft sinking hazardsConfined Spaces Regulations 1997 (where applicable)Work at Height Regulations 2005 (where a fall risk exists)Construction (Design and Management) Regulations 2015Health and Safety at Work etc. Act 1974
    TBM entrapmentProvision and Use of Work Equipment Regulations 1998 (PUWER)Construction (Design and Management) Regulations 2015Health and Safety at Work etc. Act 1974
    Restricted egress/rescueConstruction (Design and Management) Regulations 2015 (regs 30 and 31: emergency procedures, routes and exits)Confined Spaces Regulations 1997 (where applicable)Health and Safety at Work etc. Act 1974

    D3Piling & Drilling6

    RefHazardLaw / regulation / recognised guidance
    Piling rig instability/overturningProvision and Use of Work Equipment Regulations 1998 (PUWER)Lifting Operations and Lifting Equipment Regulations 1998 (LOLER) (where lifting operations are involved)Construction (Design and Management) Regulations 2015Health and Safety at Work etc. Act 1974
    Pile casing/auger collapseProvision and Use of Work Equipment Regulations 1998 (PUWER)Lifting Operations and Lifting Equipment Regulations 1998 (LOLER) (where lifting operations are involved)Construction (Design and Management) Regulations 2015Health and Safety at Work etc. Act 1974
    Bentonite/slurry spillsControl of Substances Hazardous to Health Regulations 2002 (COSHH) (where hazardous slurry or additives are used)Environmental Protection Act 1990 (where applicable) (where pollution controls apply)Construction (Design and Management) Regulations 2015Health and Safety at Work etc. Act 1974
    Noise/vibration damage to structuresBS 5228-2 (vibration control on construction sites, recognised practice)Control of Noise at Work Regulations 2005 (worker exposure, where applicable)Control of Vibration at Work Regulations 2005 (worker exposure, where applicable)Construction (Design and Management) Regulations 2015Health and Safety at Work etc. Act 1974
    Contact with buried services during pilingHSE HSG47 (avoiding danger from underground services)Electricity at Work Regulations 1989 (for electrical services)Construction (Design and Management) Regulations 2015Health and Safety at Work etc. Act 1974
    Kelly bar/leader mast failureProvision and Use of Work Equipment Regulations 1998 (PUWER)Lifting Operations and Lifting Equipment Regulations 1998 (LOLER) (where lifting operations are involved)Construction (Design and Management) Regulations 2015Health and Safety at Work etc. Act 1974

    D4Concrete Works6

    RefHazardLaw / regulation / recognised guidance
    Formwork failure (see also C7 temporary works)BS 5975 (temporary works, recognised practice)Construction (Design and Management) Regulations 2015Health and Safety at Work etc. Act 1974
    Wet concrete burns (alkali)Control of Substances Hazardous to Health Regulations 2002 (COSHH)Construction (Design and Management) Regulations 2015Health and Safety at Work etc. Act 1974
    Concrete pump blockage/whipProvision and Use of Work Equipment Regulations 1998 (PUWER)Construction (Design and Management) Regulations 2015Health and Safety at Work etc. Act 1974
    Skip/bucket swing hazardsLifting Operations and Lifting Equipment Regulations 1998 (LOLER) (where the skip/bucket forms part of a lifting operation)Provision and Use of Work Equipment Regulations 1998 (PUWER)Construction (Design and Management) Regulations 2015Health and Safety at Work etc. Act 1974
    Rebar injuries (impalement/cuts)Construction (Design and Management) Regulations 2015 (reg 17: safe places of construction work)Health and Safety at Work etc. Act 1974
    Vibrator electrocution (wet conditions)Electricity at Work Regulations 1989Provision and Use of Work Equipment Regulations 1998 (PUWER)Construction (Design and Management) Regulations 2015Health and Safety at Work etc. Act 1974

    D5Steelwork Erection5

    RefHazardLaw / regulation / recognised guidance
    Steel member dropLifting Operations and Lifting Equipment Regulations 1998 (LOLER)Construction (Design and Management) Regulations 2015Health and Safety at Work etc. Act 1974
    Connection failure during erectionConstruction (Design and Management) Regulations 2015 (reg 19: stability of structures)Health and Safety at Work etc. Act 1974
    Temporary bracing inadequacyBS 5975 (temporary works, recognised practice)Construction (Design and Management) Regulations 2015Health and Safety at Work etc. Act 1974
    Lifting/slinging of awkward loadsLifting Operations and Lifting Equipment Regulations 1998 (LOLER)Provision and Use of Work Equipment Regulations 1998 (PUWER)Construction (Design and Management) Regulations 2015Health and Safety at Work etc. Act 1974
    Working at height on steel framesWork at Height Regulations 2005Construction (Design and Management) Regulations 2015Health and Safety at Work etc. Act 1974

    D6Marine & Waterfront Works6

    RefHazardLaw / regulation / recognised guidance
    Work over or near waterConstruction (Design and Management) Regulations 2015 (reg 26: prevention of drowning)Work at Height Regulations 2005 (where a fall from height risk exists)Health and Safety at Work etc. Act 1974
    Tidal/current hazardsConstruction (Design and Management) Regulations 2015 (regs 17 and 26: safe places of work and prevention of drowning)Health and Safety at Work etc. Act 1974
    Vessel collision with worksMerchant shipping / navigation requirements (where applicable)Construction (Design and Management) Regulations 2015Health and Safety at Work etc. Act 1974
    Diving operationsDiving at Work Regulations 1997Health and Safety at Work etc. Act 1974
    Cofferdam failureConstruction (Design and Management) Regulations 2015 (reg 23: cofferdams and caissons)BS 5975 (temporary works, recognised practice) (where the cofferdam is temporary works)Confined Spaces Regulations 1997 (where applicable)Health and Safety at Work etc. Act 1974
    Marine piling vibration/noiseControl of Noise at Work Regulations 2005 (worker exposure, where applicable)Control of Vibration at Work Regulations 2005 (worker exposure, where applicable)BS 5228-1 and BS 5228-2 (noise and vibration control on construction sites, recognised practice)Construction (Design and Management) Regulations 2015Health and Safety at Work etc. Act 1974

    ELogistics, interfaces & public exposure

    E1Transport & Traffic13

    RefHazardLaw / regulation / recognised guidance
    Plant collisionsConstruction (Design and Management) Regulations 2015 (regs 27 and 28: traffic routes and vehicles)Health and Safety at Work etc. Act 1974
    Reversing vehiclesConstruction (Design and Management) Regulations 2015 (regs 27 and 28: traffic routes and vehicles)Health and Safety at Work etc. Act 1974
    Pedestrian/plant interfaceConstruction (Design and Management) Regulations 2015 (regs 27 and 28: traffic routes and vehicles)Health and Safety at Work etc. Act 1974
    Route obstructionsConstruction (Design and Management) Regulations 2015 (regs 27 and 28: traffic routes and vehicles)Health and Safety at Work etc. Act 1974
    Poor segregationConstruction (Design and Management) Regulations 2015 (regs 27 and 28: traffic routes and vehicles)Health and Safety at Work etc. Act 1974
    Blind spotsConstruction (Design and Management) Regulations 2015 (regs 27 and 28: traffic routes and vehicles)Health and Safety at Work etc. Act 1974
    Vehicle incursion from publicConstruction (Design and Management) Regulations 2015 (regs 27 and 28: traffic routes and vehicles)Health and Safety at Work etc. Act 1974
    Loading/unloading incidentsConstruction (Design and Management) Regulations 2015 (regs 27 and 28: traffic routes and vehicles)Health and Safety at Work etc. Act 1974
    Temporary traffic management failure (Red Book)Construction (Design and Management) Regulations 2015 (regs 27 and 28: traffic routes and vehicles)New Roads and Street Works Act 1991 (where applicable)Safety at Street Works and Road Works Code of Practice ('Red Book', where applicable)Health and Safety at Work etc. Act 1974
    Chapter 8 compliance failure (road works)Construction (Design and Management) Regulations 2015 (regs 27 and 28: traffic routes and vehicles)Traffic Signs Regulations and General Directions 2016 (where applicable)Traffic Signs Manual Chapter 8 (guidance, where applicable)Health and Safety at Work etc. Act 1974
    Banksman/signaller absence or errorConstruction (Design and Management) Regulations 2015 (regs 27 and 28: traffic routes and vehicles)Health and Safety at Work etc. Act 1974
    Unsecured loads during transportConstruction (Design and Management) Regulations 2015 (reg 28: vehicles)Road Traffic Act 1988 / Road Vehicles (Construction and Use) Regulations 1986 (where applicable)Health and Safety at Work etc. Act 1974
    Access/egress route failureConstruction (Design and Management) Regulations 2015 (regs 27 and 28: traffic routes and vehicles)Health and Safety at Work etc. Act 1974

    E2Public Interface & Third Party6

    RefHazardLaw / regulation / recognised guidance
    Unauthorised site accessHealth and Safety at Work etc. Act 1974 (section 3 duties to non-employees)Construction (Design and Management) Regulations 2015 (reg 18: good order and site security)
    Public exposure to noise/dust/vibrationHealth and Safety at Work etc. Act 1974 (section 3 duties to non-employees)Control of Pollution Act 1974 (where applicable)Environmental Protection Act 1990 (where applicable)Construction (Design and Management) Regulations 2015
    Falling debris onto public areasHealth and Safety at Work etc. Act 1974 (section 3 duties to non-employees)Work at Height Regulations 2005 (reg 10: falling objects)Construction (Design and Management) Regulations 2015
    Damage to third-party propertyHealth and Safety at Work etc. Act 1974 (where health or safety is affected)Party Wall etc. Act 1996 / common-law duties (where applicable)Construction (Design and Management) Regulations 2015
    Public footpath/highway obstructionHealth and Safety at Work etc. Act 1974 (section 3 duties to non-employees)Highways Act 1980 (where applicable)New Roads and Street Works Act 1991 (where applicable)Construction (Design and Management) Regulations 2015
    School/hospital proximity risksHealth and Safety at Work etc. Act 1974 (section 3 duties to non-employees)Construction (Design and Management) Regulations 2015Management of Health and Safety at Work Regulations 1999

    E3Welfare & Site Facilities6

    RefHazardLaw / regulation / recognised guidance
    Inadequate welfare facilitiesConstruction (Design and Management) Regulations 2015 (Schedule 2: welfare facilities)Health and Safety at Work etc. Act 1974
    Contaminated drinking waterConstruction (Design and Management) Regulations 2015 (Schedule 2: welfare facilities)Health and Safety at Work etc. Act 1974
    Inadequate heating/cooling in welfareConstruction (Design and Management) Regulations 2015 (Schedule 2: welfare facilities)Health and Safety at Work etc. Act 1974
    Poor hygiene facilities leading to diseaseConstruction (Design and Management) Regulations 2015 (Schedule 2: welfare facilities)Health and Safety at Work etc. Act 1974
    Inadequate drying facilities (wet PPE)Construction (Design and Management) Regulations 2015 (Schedule 2: welfare facilities)Health and Safety at Work etc. Act 1974
    Lack of secure storage (theft/vandalism)Construction (Design and Management) Regulations 2015 (reg 18: good order and site security)Health and Safety at Work etc. Act 1974

    FResidual & emergency risks

    F1Residual Risks After Completion8

    RefHazardLaw / regulation / recognised guidance
    Unprotected penetrationsWork at Height Regulations 2005Construction (Design and Management) Regulations 2015 (regs 9 and 12: residual risk information and health and safety file)Health and Safety at Work etc. Act 1974
    Weakening of structural elementsConstruction (Design and Management) Regulations 2015 (regs 12 and 19: health and safety file and stability of structures)Health and Safety at Work etc. Act 1974
    Debris/stockpiles left in situConstruction (Design and Management) Regulations 2015 (reg 18: good order and site security)Health and Safety at Work etc. Act 1974
    Contamination not remediatedConstruction (Design and Management) Regulations 2015 (regs 9 and 12: residual risk information and health and safety file)Control of Substances Hazardous to Health Regulations 2002 (COSHH) (where hazardous substances remain)Environmental Protection Act 1990 (where applicable) (where contamination controls apply)Health and Safety at Work etc. Act 1974
    Incomplete reinstatementConstruction (Design and Management) Regulations 2015 (completion and handover duties)Health and Safety at Work etc. Act 1974
    Temporary works removed prematurelyBS 5975 (temporary works, recognised practice)Construction (Design and Management) Regulations 2015Health and Safety at Work etc. Act 1974
    Latent defects (post-handover)Construction (Design and Management) Regulations 2015 (regs 9 and 12: residual risk information and health and safety file)Building Safety Act 2022 / Building Regulations 2010 (where applicable)
    Inadequate O&M manualsConstruction (Design and Management) Regulations 2015 (reg 12: health and safety file)Building Safety Act 2022 / Building Regulations 2010 (where applicable)

    F2Emergency-Related9

    RefHazardLaw / regulation / recognised guidance
    Inadequate evacuation routes/proceduresConstruction (Design and Management) Regulations 2015 (regs 30 and 31: emergency procedures, routes and exits)Health and Safety at Work etc. Act 1974
    Lack of rescue equipment/plan (confined space, height)Construction (Design and Management) Regulations 2015 (reg 30: emergency procedures)Confined Spaces Regulations 1997 (for confined-space rescue, where applicable)Work at Height Regulations 2005 (for work-at-height rescue, where applicable)Health and Safety at Work etc. Act 1974
    Medical emergencies (heart attack, anaphylaxis)Construction (Design and Management) Regulations 2015 (reg 30: emergency procedures)Health and Safety (First-Aid) Regulations 1981Health and Safety at Work etc. Act 1974
    Structural collapse during emergencyConstruction (Design and Management) Regulations 2015 (regs 19 and 30: stability of structures and emergency procedures)Health and Safety at Work etc. Act 1974
    Communication failure (radios, alarms)Construction (Design and Management) Regulations 2015 (reg 30: emergency procedures and warnings)Health and Safety at Work etc. Act 1974
    First-aid unavailabilityHealth and Safety (First-Aid) Regulations 1981Health and Safety at Work etc. Act 1974
    Inadequate emergency drillsConstruction (Design and Management) Regulations 2015 (reg 30: emergency procedures, including testing)Health and Safety at Work etc. Act 1974
    Lack of emergency lightingConstruction (Design and Management) Regulations 2015 (regs 31 and 35: emergency routes, exits and lighting)Health and Safety at Work etc. Act 1974
    Assembly point hazards (traffic, re-entry)Construction (Design and Management) Regulations 2015 (regs 27 and 30: traffic routes and emergency procedures)Health and Safety at Work etc. Act 1974
    No hazards match. Try a law, a reference such as C2, or clear the work selection.
    0ticked

    About the UK Construction Hazard Register

    The UK Construction Hazard Register lists 253 hazards in 28 categories, from CDM appointments and permit-to-work failures to cofferdam collapse and residual risk at handover. Each hazard has a fixed reference and is mapped to the law, regulation or recognised guidance behind it, with the most specific duty listed first and the general duties of the Health and Safety at Work etc. Act 1974 last.

    The builder at the top turns the register into a working list. Pick the work planned, tick the hazards that apply and print or download the list with the legislation for each, ready for a risk assessment, RAMS review, design risk register or toolbox talk. Ticks are saved in your browser, so the list is still there when you come back.

    UK construction site hazard review with engineers assessing site risks and safety controls
    Construction professionals reviewing site hazards, temporary works, lifting operations, excavations and other risks represented within the UK Construction Hazard Register. Illustration: London Construction Magazine.

    The register follows the order in which construction risk is managed: legal and organisational foundations first, then pre-construction information and site conditions, high-risk activities, specialist trades, logistics and public interface, and finally residual and emergency risks.

    Updated 25 October 2026: references renumbered so each category runs in sequence, and regulation numbers added wherever a specific duty applies. References are fixed from this version.

    This register is a hazard identification aid, not a task-specific risk assessment or legal advice. It is meant to be filtered and applied by competent people to a specific scope, project and role. British Standards, CIRIA and HSE publications are listed as recognised practice or guidance, not legislation.

    How this Construction Hazard Register should be read and used

    The register is a master hazard identification model. It does not replace project-specific risk assessments, method statements or design decisions; it sets out the hazards that can reasonably arise in UK construction, organised the way risk is identified, controlled and evidenced under the Construction (Design and Management) Regulations 2015 and wider health and safety law.

    The structure follows the construction risk lifecycle, not a trade sequence.

    A

    Section A establishes the legal, organisational and human factors that sit upstream of physical harm and are repeatedly identified by regulators as root causes of serious incidents.

    B

    Section B reflects pre-construction information duties, site conditions and environmental constraints that shape risk before work starts.

    C

    Section C captures high-risk construction activities that carry inherent potential for serious injury or catastrophic failure.

    D

    Section D addresses specialist and discipline-specific activities where risk profiles change due to method, equipment or environment.

    E

    Section E focuses on logistics, movement, interfaces and public exposure, which are common sources of harm despite being non-technical.

    F

    Section F identifies residual and long-term risks that remain after construction and must be communicated through the Health and Safety File.

    Each hazard has a fixed reference that can be carried into risk assessments, RAMS, audits, investigations and digital systems. Some hazards appear in more than one category on purpose: the same physical hazard can arise from different activities, and each needs its own controls.

    The law column lists the statutory framework for each hazard and, where useful, recognised guidance. The most specific duty comes first, such as the relevant regulation of CDM 2015 or a schedule of the Work at Height Regulations 2005, and the general duties under the Health and Safety at Work etc. Act 1974 come last. A listed regulation does not apply in isolation, and a realised hazard is not automatically an offence: UK health and safety law turns on duty, reasonable practicability and foreseeability.

    The builder exists to scope the register. Expect to leave out hazards that do not apply to a project, phase or role, and to split a hazard where a particular method adds risk. A hazard missing from a project risk assessment should be a deliberate decision, not an oversight, and a hazard listed here does not mean the work is unsafe once suitable controls are in place.

    Who uses the register
    Designers & principal designers

    For designers and principal designers, the register supports early hazard identification, residual risk communication and coordination under CDM.

    Principal contractors & contractors

    For principal contractors and contractors, it supports systematic RAMS development, competence checks, sequencing and interface management.

    Specialist contractors

    For specialist contractors, it provides a framework for demonstrating that hazards inherent to their activities have been recognised and addressed.

    Clients, auditors & regulators

    For clients, auditors and regulators, it provides a transparent basis for assessing whether risk has been properly considered rather than retrospectively rationalised.

    Since the Building Safety Act 2022, evidence of how decisions were made matters as much as the outcome. Hazard identification is part of showing competence, control and accountability, and a consistent register with legal references supports proportionate safety management without reducing it to a tick-box exercise.

    Used properly, the register sits beneath project documentation as a stable reference layer that supports professional judgement. It is deliberately comprehensive: after an incident, the question is usually whether a hazard was reasonably foreseeable and properly managed, and a register like this helps show that it was considered.