UK construction businesses choosing a market forecast in November 2026 should first decide whether they need an estimate of work completed, project starts, tender prices or labour demand. The latest forecasts point to recovery in 2027, but the figures are not interchangeable: the Construction Products Association (CPA) expects total construction output to grow 0.4% in 2027, CITB forecasts UK output growth of 1.8%, and Glenigan expects the value of underlying project starts to rise 11%.
The useful purchase decision is whether a report measures the workload, geography and time horizon relevant to a business, and whether its past predictions can be tested. London Construction Magazine sets out an eight-part, 100-point forecast quality test below, including a method for checking historical predictions against matching published outturns without awarding untested provider rankings.
The 2027 forecasts in figures
+0.4%CPA forecast for total construction output in Great Britain in 2027
+1.8%CITB forecast for total construction output in the UK in 2027
+11%Glenigan forecast for the value of underlying project starts in 2027
100 pointsIn the LCM forecast quality test, with 25 for historical accuracy
Sources: CPA, CITB and Glenigan forecasts published in 2026; London Construction Magazine test. The three forecasts measure different things.
Choose the measure before choosing the report
The Office for National Statistics (ONS) construction bulletin measures output from work carried out and publishes new orders and output-price indices. The CPA forecasts concentrate on construction output by sector. Glenigan's November 2026 forecast focuses on projects starting on site. BCIS forecasts address new work, building costs and tender prices, while the CITB Construction Workforce Outlook connects predicted activity to workforce demand.
What each source measures
| Source | What it measures | The question it answers |
|---|---|---|
| Office for National Statistics | Output from work carried out, new orders and output prices | What has actually been built and ordered? |
| Construction Products Association | Construction output by sector | How much work will be done, and in which sectors? |
| Glenigan | Projects starting on site | When will new projects begin? |
| BCIS | New work, building costs and tender prices | What will work cost to build and to buy? |
| CITB | Predicted activity and workforce demand | How many workers will the work need? |
Source: London Construction Magazine summary of each publisher’s own description.
New orders are contracts for future work; construction output records activity already delivered. An accepted tender-price index describes what clients agree to pay for work, incorporating market pricing, while building-cost indices track inputs. A rise in one series can coincide with a fall in another. These answer separate commercial questions.
What the 2027–2029 forecasts actually say
The CPA published its Autumn 2026 forecast on 26 October, Glenigan issued its Winter outlook on 10 November, and BCIS released its third-quarter forecast on 8 October. CITB published the 2026–2030 workforce outlook on 17 June. The table preserves each forecaster's scope and the years available in public sources, with the CPA's 2028 total reported separately by an industry association reproducing its forecast.
Four forecasts, four different measures
| Provider and metric | 2026 | 2027 | 2028 | 2029 |
|---|---|---|---|---|
| CPA Total construction output, Great Britain | −4.0% | +0.4% | +2.9% (industry summary) | Not published in current public summary |
| CITB Total construction output, UK | −0.2% | +1.8% | +2.8% | +2.3% |
| BCIS Total new work output | −3.7% | +2.2% | No public annual figure in the October summary | No public annual figure in the October summary |
| Glenigan Value of underlying project starts | −13% | +11% | +7% | Forecast stops at 2028 |
Sources: CPA Autumn forecast, 26 October 2026; CITB Construction Workforce Outlook, 17 June 2026; BCIS forecast, 8 October 2026; Glenigan forecast, 10 November 2026. The rows measure different things and cannot be compared directly.
The McBains October 2026 market report repeats the 1.8%, 2.8% and 2.3% annual output sequence for 2027–2029 and attributes those figures to CITB in its report. It is an additional interpretation of CITB's projections, not another independent numerical forecast. Counting it as a separate vote would give the same model artificial weight.
The difference between CPA's +0.4% and CITB's +1.8% for 2027 is 1.4 percentage points; the figures cover Great Britain and the UK respectively, and are produced under different methodologies. It is not a like-for-like forecast error. Glenigan's +11% starts projection belongs in a separate category altogether.
What the numbers imply for housing and infrastructure
The CPA's October release forecasts private new housing output falling 10% in 2026 and another 3% in 2027. Private housing repair, maintenance and improvement is forecast to contract 8% in 2026 and 2% in 2027. Infrastructure follows a different path, with forecast output growth of 2.5% in 2026 and 2.9% in 2027, supported by energy generation, electricity distribution and water investment.
Glenigan's November update projects a 24% fall in private-housing project starts during 2026, followed by a gradual recovery. For 2027, it forecasts civil engineering starts up 11%, education starts up 9% and health starts up 11%. These projections describe projects beginning work and cannot be added to CPA's output growth rates.
CITB's national outlook forecasts average annual output growth from 2026 to 2030 of 3.6% in public new housing and 2.5% in infrastructure and private new housing. It also estimates an average requirement for 41,200 additional workers each year over that period, including replacement demand. Those are five-year averages and workforce requirements, not 2027 sector growth rates or guaranteed vacancies.
Match report coverage to a construction decision
A main contractor setting a 2027 bid budget needs an output and new-work outlook in its target sectors, plus actual regional orders. A civils contractor deciding where to pursue work needs the timing of credible project starts and infrastructure programme milestones. A quantity surveying team preparing tender allowances needs accepted tender-price indices, building-cost forecasts and a check of the contract's applicable fluctuation provisions.
London businesses should insist on a London series where their decision depends on the capital. CITB provides nation and English-region filters, including Greater London, while Glenigan publishes project-start analysis by sector and region. The CPA headline series is for Great Britain and cannot be presented as a forecast of London output. LCM's earlier London construction market outlook for 2027 demonstrates why local office starts, housing delivery and Gateway approval evidence need to sit alongside national projections.
Experian also publishes economic and regional forecasting services, but the specific report edition, sector breakdown, reference-price basis and licence must be checked from the material offered to the buyer. A consultancy presentation containing an Experian estimate from May 2026 should not be filed as a current November forecast merely because it appears in a newer presentation.
Check the forecast against the latest official observations
The ONS release of 12 November 2026 estimated that Great Britain's total construction output fell 0.7% in Q3 2026, with new work down 1.6% and repair and maintenance up 0.5%. New orders rose 1.2% during the quarter, while the annual construction output price increase was 3.2% in September. These are observed series with different measurement periods; none alone establishes which full-year 2027 forecast will prove accurate.
The Department for Business and Trade's October materials commentary separately records Experian's Summer 2026 output projections of +4.3% in 2027 and +5.0% in 2028. The publication date matters because subsequent energy and borrowing-cost assumptions changed. Buyers should ask for the release date, data cut-off and revision history before comparing this earlier outlook with the CPA's October release.
For estimates and bid pricing, BCIS reported annual building-cost growth of 4.3% and annual tender-price growth of 3.2% in Q3 2026. LCM examined this difference in its contractor absorption gap analysis. The 1.1 percentage-point spread is between two price indices; it is not a change in construction output, an individual contractor's margin or a promised tender saving.
Free evidence, paid analysis and licence checks
The ONS output datasets provide free historical series for volume and current-price comparisons. CITB's interactive outlook provides national and regional forecasts with supporting reports and downloadable data. The CPA publishes headline releases and a forecast catalogue; its fuller sector analysis is available through its publication and membership arrangements. Glenigan makes a forecast summary available through its report page, while BCIS reserves full technical briefings for subscribers.
Before buying a report, request a written specification covering the exact edition and years, geographic breakdown, whether outputs are in constant or current prices, update entitlement, Excel or CSV access, number of users and rights to reproduce figures. Quote-based subscriptions should be compared on the same coverage and licence terms. Unpublished prices require written quotations.
The LCM 100-point forecast quality test
LCM proposes the following selection framework for construction teams comparing report editions. Scores describe the quality of evidence available for a defined business decision, not a permanent ranking of forecast publishers. The eight categories total 100 points; past accuracy receives the largest weight because an attractive dashboard cannot compensate for a poor record on comparable predictions.
Eight tests, 100 points
| Assessment | Points | Evidence to request |
|---|---|---|
| Historical accuracy | 25 points | Archived annual forecast vintages matched to the same measured outturn |
| Methodology transparency | 15 points | Source series, geography, price basis, assumptions and published limitations |
| Sector coverage | 15 points | Relevant housing, infrastructure, commercial, industrial and RM&I breakdowns |
| Revision traceability | 10 points | Prior edition, dated changes and explained assumption revisions |
| London and regional detail | 10 points | Specific London figures and boundaries matching the business territory |
| Freshness and horizon | 10 points | Publication date, data cut-off and years available |
| Commercial usability | 10 points | Downloadable series, usable tables and definitions suited to procurement or resourcing |
| Cost and licence terms | 5 points | Written total price, renewal provisions, seats and reuse permissions |
| Total | 100 points | Only scored where underlying evidence has been examined |
Source: London Construction Magazine forecast quality test. No forecast publisher has been scored.
Give each criterion a documented score up to its stated maximum. Keep an untested field marked "not assessed", separate from zero for a demonstrated failure. Do not publish a total if any essential evidence is missing, and do not imply that high scores predict an individual scheme's start date or tender cost. The relevant sector and geography should be declared before comparing reports.
How to back-test a forecast without inventing accuracy
Start with four or more completed target years where the original dated forecasts and matching outturn series are available. For each provider, archive the forecast as originally published, its publication date, target year, geographic coverage, metric and price basis. Fix a comparable decision horizon, such as a forecast issued in the preceding autumn, rather than combining a two-year-ahead prediction with an in-year revision.
For real-terms total output forecasts covering Great Britain, use matching ONS chained-volume construction output growth for the same calendar years. For a UK-wide forecast, obtain a compatible UK series or an explicitly documented re-basing; Great Britain is not a substitute. Test Glenigan's starts against realised starts defined by the same project-value threshold, not ONS output or new orders. Test BCIS tender-price forecasts against the corresponding realised BCIS tender-price index, keeping the same index series and quarters.
Calculate absolute error for each matched year as the absolute difference between forecast growth and outturn growth, in percentage points. Mean absolute error is the sum of those differences divided by the number of matched observations. Record the direction of error and whether the forecast called growth or contraction correctly. Compare both the first published outturn and a later revised outturn so statistical revisions remain visible.
To allocate the 25 historical-accuracy points, LCM's proposed rule is 25 multiplied by the larger of zero and (1 minus mean absolute error divided by five percentage points). The five-point reference is an editorial scoring threshold, not a regulatory or academic standard. Apply that rule only after fixing the same metric, geography, horizon and observation set for all reports being compared; otherwise leave historical accuracy unscored.
The accuracy formula. Points for historical accuracy = 25 × the larger of zero and (1 − mean absolute error ÷ 5 percentage points). A forecaster whose predictions missed by an average of 1 percentage point would earn 20 of the 25 points. The five-point reference is an LCM editorial threshold, not a regulatory or academic standard.
Four checks before relying on a forecast
The four checks
| Check | What to look for |
|---|---|
| 1. Date and data cut-off | When the forecast was published and how recent its information is |
| 2. Publication lineage | Whether two reports repeat the same underlying projection |
| 3. What is measured | Planned starts, work executed or accepted tender prices |
| 4. Local evidence | Actual orders, procurement notices and project-stage evidence where the business operates |
Source: London Construction Magazine.
First, inspect the date of the forecast and its data cut-off. BCIS's October 2026 building briefing used information available up to 8 September, before some subsequent economic releases. Second, identify the publication lineage: McBains' use of CITB figures is one set of underlying output projections, not two. Third, verify whether the forecast covers planned starts, work executed or accepted tender prices. Fourth, compare the report with actual orders, procurement notices and project-stage evidence in the locations where the business operates.
For an annual business plan, maintain the forecast edition and a short record of the assumptions that would change the decision: mortgage finance for private housing, budget and procurement timing for public projects, energy prices for inputs, and the availability of specialist labour. Reassess the business plan when those assumptions move, even before the next full industry forecast is published.
Method and Sources
London Construction Magazine compared the published 2027 output growth rates of 0.4% in the CPA's 26 October 2026 release and 1.8% in CITB's 2026–2030 outlook, a difference of 1.4 percentage points; the two series use different geographic scopes and forecast methods.
The forecast-quality weights and historical-scoring formula are proposed editorial assessment rules, with no provider test scores assigned. Source comparisons used public material available by 28 November 2026, including the ONS bulletin dated 12 November 2026 and the dated provider releases linked above. This guide is general information, not investment or commercial advice.