London Construction Magazine Directory
Plant & Equipment
Explore plant hire, equipment sales, lifting, tools and machinery suppliers serving London and the wider UK construction industry.
This category is now open and accepting its first members.
Companies in this category
Plant hire, equipment sales, lifting, tools and machinery suppliers. No companies are listed yet; approved members will appear here as they join.
Your Company Here
Claim your place in the London Construction Magazine Directory
Your Company Here
Claim your place in the London Construction Magazine Directory
Your Company Here
Claim your place in the London Construction Magazine Directory
Every member receives the same listing. There are no paid positions, and no limit on the number of companies in this category.
What plant and equipment suppliers do
Plant and equipment suppliers provide the machines that do the heavy work on site: excavators, cranes, hoists, access platforms, pumps and powered tools. Hire companies supply and maintain machines for as long as a job needs them, often with a trained operator, while dealers sell and service equipment for contractors who run their own fleets. Lifting equipment must also be thoroughly examined at set intervals under the Lifting Operations and Lifting Equipment Regulations 1998.
The Plant & Equipment category of the London Construction Magazine Directory is for businesses supplying equipment and services such as:
- Plant hireExcavators, dumpers, rollers and telehandlers, with or without an operator.
- Crane hire and liftingTower, mobile and crawler cranes, lifting plans and contract lifts.
- Powered accessScissor lifts, boom lifts and mast-climbing work platforms.
- HoistsPassenger and goods hoists and material handling for multi-storey sites.
- Tool hirePowered and hand tools, breakers, cutting and drilling equipment.
- Equipment salesNew and used machinery, attachments and spare parts.
- Piling and drilling rigsSpecialist rigs and attachments for foundation and ground engineering work.
- Concrete plantConcrete pumps, mixers, batching plant and placing booms.
- Site accommodation and welfareCabins, welfare units, toilets and secure storage.
- Power, pumps and temporary servicesGenerators, lighting towers, pumps, heaters and dehumidifiers.
- Servicing and inspectionMaintenance, repairs, thorough examinations and testing.
- Low-emission plantElectric, hybrid and low-emission machines for sites with air quality requirements.
These are examples of equipment and services within the category, not separate directory categories. A listed company may supply some of these and not others. Confirm each company’s equipment certification, examination and maintenance records, operator competence and insurance directly before hiring or buying.
Is Your Business a Plant Hire or Equipment Supplier?
Approved businesses can join the London Construction Magazine Directory for £150 a year. No VAT is charged, and applications are reviewed before any invoice is issued.
- Company name and logo
- Listing in the relevant construction category
- Website and email contact details
- Official Recognised Directory Member badge
The badge is undated and individually numbered, and members may use it for as long as their membership is active.
Claim Your Directory Listing
Plant & Equipment directory: questions and answers
Where can I find plant hire and equipment suppliers in London?
This page is the Plant & Equipment category of the London Construction Magazine Directory, which lists businesses serving London and the wider UK construction industry. The directory opened in November 2026 and this category is accepting its first members. Approved companies will appear on this page, each with its website and public email address, as they join.
What does the Plant & Equipment category cover?
The category covers plant hire, equipment sales, lifting, tools and machinery suppliers. Examples include plant hire, crane hire and lifting, powered access, hoists, tool hire, equipment sales, piling and drilling rigs, concrete plant, site accommodation and welfare, power, pumps and temporary services, servicing and inspection and low-emission plant. A listed company may supply some of these and not others, so check each company’s own website for its range.
Does the directory include suppliers operating outside London?
Yes. The directory serves businesses operating in London and across the UK construction industry. A company does not need to be headquartered in London to be listed.
How can my plant or equipment business join the directory?
Complete the application form on the directory membership page. London Construction Magazine reviews each application before any invoice is issued. Once an approved applicant has paid, its listing is published in this category and its individually numbered badge is supplied.
How much does an annual LCM directory listing cost?
Membership costs £150 for 12 months, billed annually by invoice, and no VAT is charged. It includes the company name and logo, a listing in one category, website and public email contact details, and the Recognised Directory Member badge. There are no tiers and no paid ranking positions.
Does LCM directory membership mean a supplier or its equipment is approved or certified?
No. Membership shows that a business is a current, reviewed member of the London Construction Magazine Directory. It is not an accreditation, certification, pre-qualification or approval, and it is not an assessment of equipment condition, safety performance or financial standing. London Construction Magazine is a publication, not a certification body, so check examination records, certification and insurance yourself before hiring or buying any equipment.
The London Construction Magazine Directory is a paid membership directory published by London Construction Magazine Limited. A listing is not an accreditation, certification or recommendation, and it is separate from the magazine’s independent editorial coverage. How to join the directory.