London Construction Magazine Directory
Structural Engineering
Explore structural and civil engineering consultancies, designers and checking engineers working in London and across the wider UK construction industry.
This category is now open and accepting its first members.
Companies in this category
Structural and civil engineering consultancies, designers and checking engineers. No companies are listed yet; approved members will appear here as they join.
Your Company Here
Claim your place in the London Construction Magazine Directory
Your Company Here
Claim your place in the London Construction Magazine Directory
Your Company Here
Claim your place in the London Construction Magazine Directory
Every member receives the same listing. There are no paid positions, and no limit on the number of companies in this category.
What structural engineers do
Structural engineers design the parts of a building that carry load: foundations, frames, floors, walls and roofs. They work out how a structure will stand up to its own weight, its use, the wind and the ground it sits on, and produce the calculations and drawings the contractor builds from. They also assess whether existing structures can safely take alterations or new loads. Civil engineers apply the same disciplines to infrastructure such as roads, bridges, drainage and earthworks.
The Structural Engineering category of the London Construction Magazine Directory is for businesses delivering work such as:
- Structural designDesign of frames, floors, walls and roofs in steel, concrete, timber and masonry.
- Civil engineering designRoads, drainage, earthworks, utilities and external works.
- Foundation and substructure designFoundations, retaining walls, ground-bearing slabs and substructures.
- Structural calculationsCalculations and drawings to support Building Regulations approval.
- Independent design checksIndependent checking of permanent and temporary works designs, including Category 2 and 3 checks.
- Structural surveys and appraisalsInspection and assessment of existing buildings, defects and load capacity.
- Alterations and refurbishmentDesign for new openings, extensions, additional storeys and change of use.
- Basement engineeringBasement construction, underpinning and engineering input to party wall matters.
- Façade and specialist structuresFaçade retention, cladding support, structural glass and bespoke structures.
- Higher-risk building designStructural design information and evidence for higher-risk building applications.
- Investigations and expert reportsStructural investigations, failure analysis and expert witness reports.
- Low-carbon structural designEmbodied carbon assessment, reuse of existing structures and material-efficient design.
These are examples of work within the category, not separate directory categories. A listed company may work in some of these areas and not others. Confirm each company’s experience, professional qualifications and professional indemnity insurance directly before appointing it. Chartered membership can be checked with the Institution of Structural Engineers or the Institution of Civil Engineers.
Is Your Business a Structural Engineering Consultancy?
Approved businesses can join the London Construction Magazine Directory for £150 a year. No VAT is charged, and applications are reviewed before any invoice is issued.
- Company name and logo
- Listing in the relevant construction category
- Website and email contact details
- Official Recognised Directory Member badge
The badge is undated and individually numbered, and members may use it for as long as their membership is active.
Claim Your Directory Listing
Structural Engineering directory: questions and answers
Where can I find structural engineers in London?
This page is the Structural Engineering category of the London Construction Magazine Directory, which lists businesses serving London and the wider UK construction industry. The directory opened in November 2026 and this category is accepting its first members. Approved companies will appear on this page, each with its website and public email address, as they join.
What does the Structural Engineering category cover?
The category covers structural and civil engineering consultancies, designers and checking engineers. Examples include structural design, civil engineering design, foundation and substructure design, structural calculations, independent design checks, structural surveys and appraisals, alterations and refurbishment, basement engineering, façade and specialist structures, higher-risk building design, investigations and expert reports and low-carbon structural design. A listed company may work in some of these areas and not others, so check each company’s own website for its scope.
Does the directory include engineers operating outside London?
Yes. The directory serves businesses operating in London and across the UK construction industry. A company does not need to be headquartered in London to be listed.
How can my engineering consultancy join the directory?
Complete the application form on the directory membership page. London Construction Magazine reviews each application before any invoice is issued. Once an approved applicant has paid, its listing is published in this category and its individually numbered badge is supplied.
How much does an annual LCM directory listing cost?
Membership costs £150 for 12 months, billed annually by invoice, and no VAT is charged. It includes the company name and logo, a listing in one category, website and public email contact details, and the Recognised Directory Member badge. There are no tiers and no paid ranking positions.
Does LCM directory membership mean an engineer is approved or accredited?
No. Membership shows that a business is a current, reviewed member of the London Construction Magazine Directory. It is not an accreditation, certification, pre-qualification or approval, and it is not an assessment of competence, design quality or professional qualifications. London Construction Magazine is a publication, not an accreditation body, so carry out your own checks, including qualifications and professional indemnity insurance, before appointing any engineer.
The London Construction Magazine Directory is a paid membership directory published by London Construction Magazine Limited. A listing is not an accreditation, certification or recommendation, and it is separate from the magazine’s independent editorial coverage. How to join the directory.