London Construction Magazine Directory
Testing & Inspection Companies
Explore construction testing, structural inspection, site investigation, surveying and monitoring businesses serving London and the wider UK construction industry.
This category is open to new members.
Companies in this category
Materials and structural testing, site investigation, surveying, monitoring and inspection services. Approved members are listed below, and new members are added as they join.

Swantest
Swantest is a specialist company providing structural testing, investigation, remedial and strengthening solutions for complex projects.
- Website www.swantest.co.uk
- Email info@swantest.co.uk
Recognised Directory MemberID LCM-1001
Your Company Here
Claim your place in the London Construction Magazine Directory
Your Company Here
Claim your place in the London Construction Magazine Directory
Every member receives the same listing. There are no paid positions, and no limit on the number of companies in this category.
What construction testing and inspection covers
Testing and inspection businesses provide the measured evidence that construction projects rely on: what a material or structure is, what condition it is in, and whether it performs as the design assumes. Their work informs design decisions on refurbishment and new-build schemes, supports temporary works and demolition planning, and provides records for clients, engineers and building control.
The Testing & Inspection category of the London Construction Magazine Directory is for businesses providing services such as:
- Construction materials testingLaboratory and site testing of concrete, aggregates, soils, steel, masonry and other materials.
- Structural investigationsOpening-up works, sampling and assessment to establish how an existing structure is built and its condition.
- Concrete testingCore sampling, compressive strength testing, carbonation, chloride and cover surveys.
- Anchor and fixing testingPull-out and proof load testing of anchors, fixings and holding-down bolts.
- Non-destructive testing (NDT)Reinforcement scanning, ground-penetrating radar, ultrasonic and other methods that do not damage the structure.
- Site investigationBoreholes, trial pits, in-situ ground testing and geotechnical or geo-environmental reporting.
- Structural monitoringMovement, vibration, crack and settlement monitoring during and after construction.
- Building inspectionInspection of buildings and building elements for defects, compliance and condition.
- Construction surveyingMeasured, topographical and setting-out surveys and as-built records.
- Load testingStatic load tests of floors, balconies, barriers, piles, platforms and lifting points.
- Condition surveysPre-construction, dilapidation and schedule of condition surveys of structures and adjoining property.
- Engineering inspection servicesIndependent examination of structures, temporary works, plant and equipment by competent engineers.
These are examples of services within the category, not separate directory categories. A listed company may provide some of them and not others. Confirm each company’s scope, accreditations and insurance directly before appointing it.
Does Your Business Provide Testing or Inspection Services?
Approved businesses can join the London Construction Magazine Directory for £150 a year. No VAT is charged, and applications are reviewed before any invoice is issued.
- Company name and logo
- Listing in the relevant construction category
- Website and email contact details
- Official Recognised Directory Member badge
The badge is undated and individually numbered, and members may use it for as long as their membership is active.
Claim Your Directory Listing
Testing & Inspection directory: questions and answers
Where can I find construction testing and inspection companies in London?
This page is the Testing & Inspection category of the London Construction Magazine Directory, which lists businesses serving London and the wider UK construction industry. The directory opened in November 2026. Approved member companies are listed on this page, each with its website and public email address, and new members are added as they join.
What services does the Testing & Inspection category cover?
The category covers materials and structural testing, site investigation, surveying, monitoring and inspection services. Examples include construction materials testing, structural investigations, concrete testing, anchor and fixing testing, non-destructive testing (NDT), site investigation, structural monitoring, building inspection, construction surveying, load testing, condition surveys and engineering inspection services. A listed company may provide some of these services and not others, so check each company’s own website for its scope.
Does the directory include companies operating outside London?
Yes. The directory serves businesses operating in London and across the UK construction industry. A company does not need to be headquartered in London to be listed.
How can my testing or inspection company join the directory?
Complete the application form on the directory membership page. London Construction Magazine reviews each application before any invoice is issued. Once an approved applicant has paid, its listing is published in this category and its individually numbered badge is supplied.
How much does an annual LCM directory listing cost?
Membership costs £150 for 12 months, billed annually by invoice, and no VAT is charged. It includes the company name and logo, a listing in one category, website and public email contact details, and the Recognised Directory Member badge. There are no tiers and no paid ranking positions.
Does LCM directory membership constitute technical accreditation?
No. Membership shows that a business is a current, reviewed member of the London Construction Magazine Directory. It is not a technical accreditation, certification or approval, and it is not an assessment of competence. London Construction Magazine is a publication, not an accreditation body, so check a company’s own accreditations, such as UKAS, directly with the company or the accrediting body.
The London Construction Magazine Directory is a paid membership directory published by London Construction Magazine Limited. A listing is not a technical accreditation, certification or recommendation, and it is separate from the magazine’s independent editorial coverage. How to join the directory.