UK construction market intelligence platforms should be compared against the decisions a business needs to make: which projects to pursue, when a tender is actually open, who is procuring the work and whether the information is current. A large database of planning applications may help a product manufacturer reach designers early, but a specialist subcontractor needs confirmed contractors, package enquiries and realistic bid dates. The same subscription will not serve both businesses equally well.
In November 2026, services including Glenigan, Barbour ABI, Constructionline Market Intelligence, Tracker, Planning Pipe and newer specialist platforms cover different parts of that process. London Construction Magazine has developed an eight-factor, 100-point assessment rubric that asks buyers to test a sample of relevant records against primary sources before committing to a paid contract. No provider is awarded a performance score in this guide because LCM has not carried out comparable live-account tests.
The assessment in figures
8 testsWeighted factors in the LCM buyer-side assessment rubric
100 pointsTotal weight, with 20 for project and contact accuracy
15 recordsSample to check against primary sources before buying
90 daysWritten notice to stop automatic renewal in Glenigan’s general terms
Sources: London Construction Magazine rubric; Glenigan general terms of business, updated 24 July 2026. No provider has been given a performance score.
Choose the intelligence you actually need
Project intelligence, public procurement intelligence and construction cost intelligence answer different questions. Glenigan describes a combination of planning-data collection and researcher verification. Barbour ABI markets project-stage filtering and a UK-based research service. Both are relevant to firms looking for private and public construction opportunities across several stages, although their published database totals use provider-defined measures and are not a sound basis for a direct accuracy ranking.
Constructionline Market Intelligence, formerly associated with Builders' Conference, concentrates on project leads, contractor relationships and tender or award information. Tracker combines public procurement intelligence with an optional commercial-projects service. Neither should be confused with supplier prequalification itself: being visible in a database does not place a subcontractor on an approved tender list.
Nine services and sources, and what to check
| Service or source | Primary use to examine | Important purchasing check |
|---|---|---|
| Glenigan | Planning-to-award project leads, companies and forecasts | Are contacts and stage updates verifiable in your region? |
| Barbour ABI | Construction projects, decision-makers and market research | Does the sample cover your trades and procurement window? |
| Constructionline Market Intelligence | Contractor-linked opportunities and project updates | Are subcontract packages genuinely accessible to your business? |
| Tracker | Public tenders, awards, buyer analysis; optional commercial leads | Which datasets and private-project modules are included? |
| Planning Pipe and Strukta | Planning-led leads and searchable smaller-business workflows | Does the subscription include your councils, trades and exports? |
| PSC Pipeline | Early public-sector construction project research | How early are records and what evidence supports the project stage? |
| Candour | Specification monitoring aimed at building product manufacturers | Can changes to specifications be demonstrated on real files? |
| BCIS | Construction costs, tender-price indices and benchmarking | Which cost series, licence and geographic adjustments do you need? |
| Find a Tender and council registers | Official public notices and planning evidence | Can your team build its own repeatable search process? |
Source: LCM review of provider descriptions and official sources, 27 November 2026. The table describes what each service says it covers; it is not a ranking or a performance score.
The specialist services differ materially. PSC Pipeline describes its focus as early public-sector schemes in England and Wales. Candour targets manufacturer specification intelligence. BCIS supplies construction cost and price data, which is a different product from a list of jobs to bid for. The former Construction Market Data (CMD) business is now within ConstructConnect, whose corporate history identifies the United States and Canada as its project-data market; CMD should not be treated as a UK substitute for Glenigan or Barbour ABI.
A project lead is not the same as an open tender
A construction intelligence record must identify its stage and the evidence for that stage. A planning application is a proposal; a decision notice grants a form of planning permission; a public tender notice invites responses; a framework appointment establishes a procurement route; and a call-off concerns a particular requirement within that route. A project can be approved without funding, a main contractor or a construction start date. LCM's guide to UK planning intelligence before tender explains how to trace the planning record before approaching a prospective buyer.
For procurements governed by the Procurement Act 2023, the distinction becomes particularly sharp. A contract award notice under section 50 is ordinarily published before the public contract is entered into. A contract details notice under section 53 records the contract after it has been entered into. In Find a Tender terminology these are commonly UK6 and UK7 respectively. If a platform groups them into a single "awarded" status, check the original notice before treating a contract as signed. Older procurements can follow earlier notice rules.
The same caution applies to frameworks. A £500m framework ceiling is a possible procurement envelope, not £500m of work awarded to one contractor, and an appointed supplier has not necessarily received a project-specific order. An intelligence platform earns its subscription when it separates those records and allows the buyer to open the original notice. LCM's London infrastructure procurement-status assessment applies this distinction to named schemes.
What free government records can already prove
Find a Tender provides public procurement notices, and Contracts Finder remains relevant for parts of the public procurement record and older processes. England's Planning Data service publishes open datasets and an API, although its documentation says planning-application data specifications are still developing and authorities are not required to supply application data to that specification. Individual local authority portals remain essential for checking the actual application, drawings and decision.
Paid providers may add private-sector projects, researchers' telephone confirmation, named commercial contacts, saved searches, sector classification and a single timeline assembled from several sources. These are services to test, not proof that every project is accurate. An estimated start date, an unverified construction value and a contact copied from an old design team can appear convincing inside an otherwise polished dashboard.
The LCM 100-point platform assessment rubric
LCM proposes the following buyer-side scoring framework. It is designed for a contractor or commercial team testing a product against its own geography, trade and target project stage. It is not a certification scheme, an audited league table or a claim that any named provider has passed the assessment.
The eight tests and their weights
| Test | Maximum points | Evidence to request or check |
|---|---|---|
| Project and contact accuracy | 20 points | Match project identity, company roles and contacts to original registers or current sources. |
| Project-stage verification | 15 points | Check dates, notice types and whether tender, award and start are correctly distinguished. |
| Record freshness | 15 points | Compare provider update dates with the latest official or direct-confirmation dates. |
| Geography and sector fit | 15 points | Search your target boroughs, regions, trades, project sizes and private/public mix. |
| Actionable tender intelligence | 15 points | Check buyer identity, enquiry route, closing dates and package relevance. |
| Pricing and contract transparency | 10 points | Review the written quote, term, renewal, notice period, VAT and seat limits. |
| Search and alert quality | 5 points | Test saved searches and false-positive alerts on your actual trade terms. |
| Exports and integrations | 5 points | Demonstrate usable CSV/API/CRM outputs and permitted data reuse. |
Source: London Construction Magazine assessment rubric. The weights total 100 points. No provider has been scored.
How to score a test. Rate each test from zero to five on the evidence, then multiply the rating divided by five by the maximum weight. A rating of four on the 20-point accuracy test earns 16 points. An untested capability is marked “not assessed” and earns no points; it is not evidence of poor performance.
Each test receives an evidenced rating from zero to five, and its points are the rating divided by five multiplied by the maximum weight. A confirmed failure can score zero. An untested capability must be labelled "not assessed" and its points left unawarded, with the unavailable weight stated separately; it is not evidence of poor performance. LCM would not publish an overall comparative ranking until the same applicable tests had been carried out against each provider. Cost-data services such as BCIS should be evaluated under a cost-intelligence test, not penalised for failing to sell subcontract leads.
Run a 15-record test before buying
A practical trial begins with one written brief: target counties or boroughs, work packages, preferred project values, client types and the stage at which the business wants to engage. Ask each supplier for 15 current records drawn from that same brief, with stable record references and dated updates. Record which were supplied, and do not permit a sales presentation to substitute hand-picked success stories for the sample.
For each project, check the planning reference or public notice where one exists, the current project stage, the named buying organisation, and whether the claimed opportunity is still commercially accessible. For private projects, ask what direct confirmation supports a tender or award claim and when it was obtained. Check whether company contacts remain in the relevant roles without publishing personal details. Record the verification date and whether a discrepancy was a material error, a stale update or an information gap.
Use a common worksheet with fields for provider, sample ID, postcode, sector, claimed stage, source reference, source date, last verified date, contact role, discrepancy and outcome. The 15-record sample is an LCM proposed buyer test; it is too small to establish a platform's national accuracy rate. Its purpose is to show whether a paid feed is useful for a defined workflow before the contract is signed.
Fields for the 15-record worksheet
| Field | What to record |
|---|---|
| Provider and sample ID | Which supplier gave the record, and its stable record reference |
| Postcode and sector | Where the project is and what type of work it is |
| Claimed stage | The project stage the provider states |
| Source reference and date | The planning reference or public notice, and its date |
| Last verified date | When you checked the record against the original source |
| Contact role | Whether the named contact still holds the relevant role |
| Discrepancy and outcome | Material error, stale update or information gap |
Source: London Construction Magazine proposed buyer test. A 15-record sample is too small to establish a national accuracy rate.
Check the subscription terms as carefully as the leads
The 2026 market includes providers publishing self-serve subscription plans, such as Strukta and Planning Pipe, alongside larger services that provide tailored quotations. Compare prices only on the same basis: region, project stage, named users, export credits, training, VAT, term and the right to use the data after cancellation. A cheap entry plan may be unsuitable if it excludes the project sizes or contact information the business needs.
The small print can materially change the cost. Glenigan's general terms, updated 24 July 2026, provide for automatic 12-month extensions unless at least 90 days' written notice is given through the specified channel. Barbour ABI's published client terms describe a rolling arrangement after the initial subscription period with its own written-notice requirements. The signed order form and applicable version of the terms govern the actual deal. Obtain both before paying, including the precise renewal date and any data-export limits.
Match the purchase to the construction team
A local subcontractor working within two boroughs may obtain enough initial visibility from council planning portals, Find a Tender and a low-cost filtered alert. A regional main contractor pursuing private work may need verified client and design-team contacts before tender. A manufacturer may need specification changes and design-stage contacts. A quantity surveyor preparing estimates requires reliable cost benchmarks and tender-price information, which project-lead products do not supply in equivalent form.
Coverage also changes across the four UK nations: local planning systems differ, and public procurement must be checked against the applicable national routes. Infrastructure schemes can proceed under development consent processes outside ordinary local planning applications. Small fit-outs, privately negotiated packages and framework call-offs can leave little trace in a national planning search. LCM's construction evidence-verification guide sets out why a planning document, procurement notice and contractor announcement answer different questions.
Before signing, a buyer should be able to reproduce the platform's most valuable claims from a relevant sample, identify the current tender or procurement stage and read the full licence conditions. If the supplier cannot demonstrate those three things, an impressive total of project leads offers little evidence that the service will produce usable work.
Method and Sources
London Construction Magazine reviewed provider descriptions and terms, the UK government's Find a Tender guidance, Planning Data documentation and relevant LCM planning and procurement reporting on 27 November 2026.
LCM developed the eight weighted tests and 15-record sampling procedure as a repeatable procurement assessment method, using source verification, project-stage accuracy and contractual terms as the principal decision points. The weights total 100 points; no live paid-platform test accounts were supplied, so no vendor performance scores or national accuracy claims have been calculated. This guide is general information, not purchasing or legal advice.